Hitachi HH0-530 Questions & Answers

Full Version: 113 Q&A


Latest HH0-530 Exam Questions and Practice Tests 2025 - Killexams.com


HH0-530 Dumps HH0-530 Braindumps

HH0-530 Real Questions HH0-530 Practice Test HH0-530 Actual Questions


killexams.com


Hitachi


HH0-530


Hitachi Data Systems Certified Specialist Compute Platform


https://killexams.com/pass4sure/exam-detail/HH0-530


You are in the process of configuring a Hitachi CB 2000 system for a customer. The customer requires separate accounts for LAN and FC switch administrators. What is the proper sequence of actions to accomplish this?


  1. Create a LAN switch account, a FC switch account, a LAN switch role, and a FC switch role.

  2. Create a FC switch role, a FC switch account, a LAN switch account, and a LAN switch role.

  3. Create a LAN switch role, a LAN switch account, a FC switch account, and a FC switch role.

  4. Create a FC switch role, a LAN switch role, a LAN switch account, and a FC switch account.


Answer: D


QUESTION: 103

Which two Hitachi CB 2000 platform access methods provide connections to the individual Hitachi Compute Blade GUIs for operating system installation? (Choose two.)


  1. Use telnet to connect to the Compute Blade IP address.

  2. Use the Remote Console Application Reclient.

  3. Use the Web Console to access the Compute Blade IP address.

  4. Launch the Remote Console Java application.


Answer: B, D


QUESTION: 104

A large financial institution is deploying a Hitachi CB 2000 platform in their environment. The base system includes two 1 Gbps LAN switch modules and two 8 Gbps FC switch modules in default configuration. The customer is unable to connect port 1 of the LAN switch module to their LAN environment. What is the problem?


  1. The customer needs to upgrade from an 8 Gbps to a 16 Gbps FC environment.

  2. Port 1 is configured as a management port.

  3. The customer must install the latest patches for the operating system.


  4. Port 1 on LAN switch module does not auto-negotiate.


Answer: B


QUESTION: 105

You are configuring a new LPAR on a Hitachi Compute Blade. You have configured the CPU, memory, I/O resources and are now ready to install an operating system. Which three consoles would be used to install the operating system? (Choose three.)


  1. server blade Web console

  2. virtual COM console

  3. HVM screen

  4. Guest OS console

  5. remote console


Answer: B, D, E


QUESTION: 106

What are two functions of the Hitachi Compute Blade Web Console? (Choose two.)


  1. to monitor the power consumption history

  2. to monitor HVM usage

  3. to monitor blade environmentals

  4. to monitor the FC switch module


Answer: A, C


QUESTION: 107

What is the default configuration of a 1 Gbit LAN switch?


  1. port 1-4 external ports

  2. port 1 management, port 2-4 external ports

  3. port 1 internal port, port 2-4 external ports

  4. port 1-3 external ports, port 4 management


Answer: B


Which two Hitachi Compute Blade management software tools support N+M Cold Standby functionality across multiple chassis consisting of both Hitachi CB 500 and CB 2000 platforms? (Choose two.)


  1. the Web-based management console

  2. the Windows-based remote console

  3. Blade Symphony Management Suite (BSMS) Plus

  4. Hitachi Compute Systems Manager (HCSM)


Answer: C, D


QUESTION: 109

Which three logical steps are required to activate an LPAR on a Hitachi CB 500 platform? (Choose three.)


  1. Configure the HVM environment settings on the blade.

  2. Add the LPAR definition on the blade.

  3. Configure the network time server.

  4. Use the N+M Cold Standby setting on the blade.

  5. Set up the Logical Processor Configuration on the blade.


Answer: A, B, E


QUESTION: 110

You need to configure a multi-blade SMP server installed in slots 4 and 5. Which two consoles would you use? (Choose two.)


  1. blade 0 management Web console

  2. blade 4 management Web console

  3. CB 2000 management Web console

  4. CB 2000 SVP CLI console


Answer: C, D


QUESTION: 111

What are three features provided by Microsoft Hyper-V Fast cloud? (Choose three.)


  1. template based virtual machine provisioning

  2. virtual machine live migration

  3. management with vCenter

  4. integration with Hitachi High Availability Manager

  5. virtual machine high availability


Answer: A, B, E


QUESTION: 112

You are configuring an I/O Expansion Unit (IOEU) on a Hitachi CB 2000 platform. The customer has purchased two Hitachi Compute Blades, four IOEU interface cards and one IOEU chassis. Which configuration mode for the IOEU must be used to balance the I/O throughput across all four IOEU cards?


  1. 1:1

  2. 1:2

  3. 1:4

  4. 1:8


Answer: C


QUESTION: 113

What are two characteristics of the VNIC system number? (Choose two.)


  1. It is used to generate unique WWN addresses for all HBA ports.

  2. It is used to generate unique MAC addresses for all NIC ports for each LPAR.

  3. It must be a unique value among all HVM environments across all chassis.

  4. It must be between 0 and 128 inclusively.


Answer: B, C


User: Tashi*****

The hh0-530 exam was daunting, but Killexams.com’s practice tests made studying enjoyable. I passed with an 89% score after switching to their materials just a week before the exam, proving their resources are a game-changer.
User: Shanina*****

I am grateful for the outstanding test partner that I have in Killexams.com practice tests. Thanks to the educators who are so helpful, decent, and always willing to assist me in passing my HH0-530 exam. They are always available to answer my questions whether it is day or night. The course given to me during my exams was comprehensive and covered all the necessary topics.
User: Konstant*****

Balancing a full-time job and family responsibilities made preparing for the hh0-530 exam challenging, but killexams.com’s concise and strategic questions and answers saved the day. With just 12 days to prepare, their easy-to-recall materials and exam simulator helped me master the content efficiently. I passed the exam with confidence and am thankful for killexams.com’s invaluable resources.
User: Allan*****

If you are in need of valid hh0-530 practice tests that truly work, Killexams.com is an excellent choice. The answers were easy to recall, and I found emulating their questions and answers to be very helpful. I was able to complete my exam preparation in just 12 days, all thanks to their simple presentation and clear explanations of difficult topics.
User: Valentin*****

Preparing for the hh0-530 exam can be intimidating, but Killexams.com’s study guide made the process manageable. Their comprehensive materials complemented my studies and gave me a high chance of success. I scored 92 out of 100 and am confident that Killexams.com’s resources will benefit anyone preparing for this exam.

Features of iPass4sure HH0-530 Exam

  • Files: PDF / Test Engine
  • Premium Access
  • Online Test Engine
  • Instant download Access
  • Comprehensive Q&A
  • Success Rate
  • Real Questions
  • Updated Regularly
  • Portable Files
  • Unlimited Download
  • 100% Secured
  • Confidentiality: 100%
  • Success Guarantee: 100%
  • Any Hidden Cost: $0.00
  • Auto Recharge: No
  • Updates Intimation: by Email
  • Technical Support: Free
  • PDF Compatibility: Windows, Android, iOS, Linux
  • Test Engine Compatibility: Mac / Windows / Android / iOS / Linux

All Hitachi Exams

Hitachi Exams

Certification and Entry Test Exams

Complete exam list