Quality-Assurance ICYB Questions & Answers

Full Version: 120 Q&A


Latest ICYB Exam Questions and Practice Tests 2024 - Killexams.com

Latest ICYB Practice Tests with Actual Questions


Get Complete pool of questions with Premium PDF and Test Engine


Exam Code : ICYB
Exam Name : IASSC Certified Lean Six Sigma Yellow Belt
Vendor Name :
"Quality-Assurance"








ICYB Dumps ICYB Braindumps

ICYB Real Questions ICYB Practice Test ICYB Actual Questions


Quality-Assurance


ICYB


IASSC Certified Lean Six Sigma Yellow Belt


https://killexams.com/pass4sure/exam-detail/ICYB



Question: 112

The Control Plan is the road map to sustaining the improvements made through the Lean Six Sigma project and should therefore involve keeping the up to date as a means of supporting the Response Plan in case a defect is noticed.


  1. X-Y Diagram

  2. Shewhart Chart

  3. FMEA

  4. Customer Service Plan




Answer: C



Question: 113

To minimize waste through the application of Lean Principles we do which of the following?


  1. Collect sample data

  2. Keep the work area clean and organized

  3. Calibrate our measurement tools

  4. Survey the customer




Answer: B



Question: 114

A Lean Principle that states the process of eliminating waste is a continual process requiring one to always be on the lookout for ways to reduce the seven elements of waste is known as .


  1. Ishikawa

  2. Kaizen

  3. Kanban

  4. Muda




Answer: B



Question: 115

An important factor in a viable is to determine who, when and to what level various personnel must be trained to maintain the improvements made to a process.


  1. Control Plan

  2. FMEA

  3. Standard Operating Procedure

  4. Process Map




Answer: C



Question: 116

A Monitoring Plan put into place at the conclusion of a project will provide for adequate systems with key metric readouts indicating out-of-spec conditions.


  1. True

  2. False




Answer: A



Question: 117

The Control Plan is created following the finalization of the Measure Phase and can be closed when?


  1. After the project costs have been recouped

  2. When the Champion says so

  3. Never, a Control Plan must stay in place

  4. At the fiscal yearend of the business




Answer: C



Question: 118

Systems and structures are the basis for allowing people to change their behaviors permanently and are accomplished through which of the following?


  1. Documented performance objectives

  2. Defined procedures

  3. Accurate job descriptions

  4. Incentive compensation

  5. All of these answers are correct




Answer: E



Question: 119

To reduce the people or operator introduced defects into a process it is best if a Belt can design and implement a means of into the process.


  1. Measurement automation

  2. Operator alertness

  3. Full Automation

  4. Constant supervision




Answer: C



Question: 120

Upon completion of a project a Belt must complete the Documentation Plan then transfer responsibility for this to the .


  1. Project Review Committee

  2. Division Manager

  3. Sales Team

  4. Process Owner




Answer: D


User: Tiane*****

Every morning, I would put on my jogging shoes and head out for a run to get some fresh air and feel energized. However, on the day before my ICYB exam, I did not feel like running at all because I was so anxious about failing. I found what I needed to energize me, and it was not running, it was Killexams.com, which provided me with a pool of educational resources that helped me achieve good scores on my exam.
User: Charlotte*****

With the help of Killexams.com, I easily comprehended difficult topics such as delivery competence and content information effects. I scored 90% marks, and all credit goes to Killexams.com. I was looking for a reference guide that would assist me in preparing for the ICYB exam, but my busy schedule only allowed me a few hours of study time. However, after purchasing the Killexams.com questions and answers and exam simulator, I received it within a week and started making plans.
User: Luna*****

I want to express my gratitude to Killexams.com for their mock test on ICYB. The test was instrumental in helping me pass the exam without any difficulty. I have also used their mock tests for other exams, and I find them very helpful. Their question bank is useful, and the explanations are excellent, earning them four-star marks from me.
User: Catalina*****

I am greatly obliged to Killexams.com for their trustworthy system to pass the exam. I would like to thank the Killexams.com questions and answers exam result for my achievement in the ICYB exam. The exam was only three weeks away when I started to study with their resources, and it worked for me. I scored 89%, identifying how to finish the exam in due time.
User: Nada*****

As a network professional, I believed that taking the IASSC CERTIFIED LEAN SIX SIGMA YELLOW BELT exam would be beneficial for my career growth. However, due to time constraints, preparing for the exam became a challenge for me. I was looking for a test guide that could make the process easier for me. Fortunately, Killexams.com Questions and Answers practice tests worked wonders for me, providing a scientific approach to prepare for the exam. Surprisingly, with its help, I finished the exam in only 70 minutes, which was astonishing. Thanks to Killexams.com for providing such helpful material.

Features of iPass4sure ICYB Exam

  • Files: PDF / Test Engine
  • Premium Access
  • Online Test Engine
  • Instant download Access
  • Comprehensive Q&A
  • Success Rate
  • Real Questions
  • Updated Regularly
  • Portable Files
  • Unlimited Download
  • 100% Secured
  • Confidentiality: 100%
  • Success Guarantee: 100%
  • Any Hidden Cost: $0.00
  • Auto Recharge: No
  • Updates Intimation: by Email
  • Technical Support: Free
  • PDF Compatibility: Windows, Android, iOS, Linux
  • Test Engine Compatibility: Mac / Windows / Android / iOS / Linux

Premium PDF with 120 Q&A

Get Full Version

All Quality-Assurance Exams

Quality-Assurance Exams

Certification and Entry Test Exams

Complete exam list