Certification Practice Test | PDF Questions | Actual Questions | Test Engine | Pass4Sure
ISTQB-Advanced-Level-3 : ISTQB Advanced LevelTechnical Test Exam
ASTQB ISTQB-Advanced-Level-3 Questions & Answers
Full Version: 70 Q&A
Latest ISTQB-Advanced-Level-3 Practice Tests with Actual Questions
Get Complete pool of questions with Premium PDF and Test Engine
Exam Code : ISTQB-Advanced-Level-3
Exam Name : ISTQB Advanced LevelTechnical Test
Vendor Name :
"ASTQB"
ISTQB-Advanced-Level-3 Dumps ISTQB-Advanced-Level-3 Braindumps
ISTQB-Advanced-Level-3 Real Questions ISTQB-Advanced-Level-3 Practice Test ISTQB-Advanced-Level-3 Actual Questions
ASTQB
ISTQB-Advanced-Level-3
ISTQB Advanced LevelTechnical Test
https://killexams.com/pass4sure/exam-detail/ISTQB-Advanced-Level-3
Question: 52
Select the correct answer;
Verifying "what" the product does is part of functional testing.
Usability Testing is a domain/functional testing technique.
Inspection, evaluation and reviews are usability test techniques.
Understandability, learnability and attractiveness are attributes of usability
I, II, III true, IV false
II, III, IV true. I false
I, II true. III, IV false
All of the above true
Answer: D
Question: 53
According to the ISTQB syllabus, domain testing quality attributes are;
Accuracy, Suitability, Interoperability
Reliability, Maintainability, Portability
Performance, load, Adaptability
All of the above
None of the above
I and II true. III false
I true. II, III false
Answer: D
Question: 54
Select the correct statement(s). According to the ISTQB Syllabus;
Unauthorized access & copying, buffer overflow, logic bombs are part of Technical Security Testing.
Fallback, backup and restore activities are part of recoverability testing.
Verifying whether a system can handle peak loads at or above maximum capacity is called stress testing.
Verifying whether a system can "meet future efficiency requirements" is called scalability testing
26
I, II and III true. IV false
I, IV true. II, III false
II, III true. I, IV false
All of the above are true
Answer: D
Question: 55
A Software Test Analyst at ABC company. received a new software release and the installation guide from Development. He followed the installation guide and successfully installed the software. Then he followed the fallback instructions and performed a successful fallback. After verifying that the software has completely fallen back as desired, he re-installed the software. What type of testing activity did he do?
Portability testing
Efficiency testing
Reliability testing
Usability Testing
Answer: A
Question: 56
Which of the following statements are correct?
IEEE 1028 is an international standard on reviews.
Early reviews are very cost effective in finding defects.
Review is considered a static testing
Most documents can be reviewed (source code, requirements document, test plan document)
I, II and III true
I, III and IV true
I, II, III and IV true
II, III and IV true
Answer: C
Question: 57
You are a test analyst for XYZ Company. CEO of XYZ sent a meeting entry to you and your manager for a past project evidence and test d2e7liverables review. A person from an external
company would like to interview you regarding the previous project. This activity has a very high visibility from upper management. What type of review is described above?
Management Review
Technical Review
Audit
Inspection
Answer: C
Question: 58
What type of a review meeting is described below?
"You were invited to attend a meeting next week. Meeting moderator included set of metrics and a document to be reviewed along with the meeting agenda. One of the meeting agendas is to find defects in the document sent. You and the other attendees were asked to review the document prior to the meeting".
Informal Review
Inspection
Walkthrough
None of the above
Answer: B
Question: 59
Select the matching pair;
Contractual Review
Requirement Review
Design Review
Involve Managers, customers and technical staff. Review contract milestones.
Involve customers and technical staff. Review design solutions, test cases.
Involve auditor. Review compliance to processes and regulations.
Involve customers and technical staff. Reviewing functional and non functional requirements, test conditions.
I-a,II-d,III-b
I-c,II-b,III-a
I-a,II-b,III-c
I-b,II-c,III-d 28
Answer: A
Question: 60
Select the correct pair;
"Unexpected occurrence that requires a further investigation"
"Recognition of failure caused by a defect"
Requires a change to the work item
Incident
Defect
Bug
Failure
I-a,II-a,III-b
I-a,II-d,III-b
I-b,II-c,III-d
I-c,II-d,III-b
Answer: A
Question: 61
Which of the following statements are correct?
A failure can be detected only by dynamic testing technique.
Defects can exist in test environment.
All incidents require a software change.
Code and design reviews can reveal defects
I, II, III true
I, II, IV true
II, III, IV true
II, IV true
Answer: B
Question: 62
IEEE 10440-1993 specifies a standard for defect reporting. Which of the following attributes should be in a defect report as per ISTQB Syllabus?
29
Complete, concise, accurate and objective report.
Compete and accurate. Does not have to be concise or objective.
Complete and objective. Does not have to be accurate.
Accurate. Does not have to be complete, concise or objective.
Answer: A
Question: 63
A Junior software tester at ABC Inc. found a defect while testing release 2 of the eForm application. The eForm application does not accept more than 5 characters for its' "Last Name" field. Tester created a defect report. The defect report contains following information;
"eForm application does not accept more than 5 characters for its' "Last Name" field" Select the correct statement regarding the defect report;
Defect report is complete, accurate and concise.
Defect report is accurate but not complete.
Defect report is complete but not accurate.
Defect report is complete but not concise.
Answer: A
Question: 64
A major bank has recently outsourced all of its software development in an effort to reduce its fixed costs. The new supplier will be responsible for all new developments as well as enhancements to existing ones. The bank has retained its own management team for its projects. There will be an in-house project manager, development manager and test manager for each project. Some staff may work on more than one project, depending on the overall size. An enhancement is being made to allow existing customers to authorise their own loans online, from £1k to £10k by answering a series of questions. You are a test manager with the bank and you have written a test strategy for the outsourced team to follow. Unit testing has begun but informal conversations with the developers have revealed that they have not received a signed- off specification from the bank for the enhancement. They do know how loans work though and have created code from conversations with bank staff alongside their own knowledge. How could a strategy have helped to avoid this situation?
The test strategy would have identified bank staff with the right knowledge for consultation on the loan requirements.
The test strategy would have laid out the process for capturing how the loan process would work which the outsourced team would have followed.
The test strategy would have specified that a signed-off specification would be made available to the coding team prior to the start of 3d0evelopment.
The test strategy would have requested that the outsourced team take part in specifying the requirements, to make use of their knowledge.
Answer: C
Explanation:
Option A is about requirements capture, not testing. It may appear in a test plan, which may show how reviews of specifications may be carried out, but would not appear in the test strategy (it will say that reviews will be carried out, but would not name specific individuals). Answer B is again about requirements capture, it would not appear in the test strategy.
Question: 65
The aircrew of a national air defence force has requested changes to the existing aviation software that provides on-board information about the combat environment. The air force is currently engaged in a peace-keeping mission in another country and has come under unexpected threats. The development life cycle is the V model. The software house needs to change their test management process to ensure delivery at the right time and quality. The software changes are coming in as the aircrew request them, as a result of their engagements with hostile forces. The aircrew have requested that the changes are made as quickly as possible. The project manager has decided to revisit the test management process. The changes will come as small change requests. The team have worked on the project for over 25 years, with little staff turnover. Which of the following test measures should be emphasised during the crisis?
Readiness of the test environment for each run.
Number of high-priority defects being found.
Number of defects being found per tester.
Number of hours overtime being worked by staff.
Number of change requests tested versus number passed.
I, II and V
II, III and IV
II, III and V
I, II and III
Answer: A
Explanation:
Option I, ‘readiness of the test environment’, while it may be a given, should always be monitored.
Option II, ‘number of high-priority defects found’ is a good indicator of product quality and should be included.
31
Option III, ‘number of defects found per tester’ may be useful, but it would need to be combined with other data, such as requirements tested to be of any real value.
Option IV, ‘number of overtime hours worked by testers’ is unlikely to be of much concern here.
Option V, ‘number of change requests passing’ should be monitored.
Question: 66
Which of the following is NOT a true statement?
Cost benefit analysis should be done before purchasing test tools and analysis should show a good potential return on investment.
Bid bang approach is the best way to rollout test tools to an organization.
Maintenance fees, support fees, licensing fees and learning curve should be considered before introducing test tools to an organization.
Scripted / automated tests can be executed faster during test execution phase.
Answer: B
Question: 67
Which of the following statements are true about risks of introducing test automation tools?
Poorly designed test cases automated "as is" results in execution errors.
Reduce defect detection due to limited manual testing by a tester.
Too many dependencies to integrate test tools and test tool limitations.
Unrealistic expectations from management.
I, III true
II, IV true
All of them are true
None of them are true
Answer: C
Question: 68
Which of the following statements are true?
Test automation tools can be used only for one project.
Test data comparison tool can be used to avoid human data comparison mistakes.
A company can utilize multiple test tools to efficiently perform their test activities.
Purchasing suite of test tools from the same vendor guarantees that the tools will work
together. 32
II, III true. I, IV false
I, II true. III, IV false
II, III, IV true. I false
I, II, IV true. III false
Answer: A
Question: 69
Select the correct pair from the following Test Tool Categories? Test Tools Category:
Test Management Tool
Web Tools
Keyword-Driven Test Automation Tools Features of Test Tools Categories:
Supports organization of test artifacts
Less likely to modify
Help to monitor SLA (service Level Agreements) compliance
I-a,II-c,III-b
I-b,II-a,III-c
I-b,II-c,III-a
I-c,II-b,III-a
Answer: A
Question: 70
What is NOT an objective of using a Test Execution Tool?
Reduce effort or time related costs
Run more tests
Repeat tests easily
Automate all new features that are going to be delivered in next release.
Answer: D
Question: 71
XYZ Company develops websites for individual users / companies. The testing team tests each build of the software once development releases it. Once testers complete the testing, they also work on coding the next build of the software. All testers and developers report to project manager. What type of independency is achieved above as per ISTQB syllabus?
"No independent testers"
Testing is done by a tester who is part of the development team
"External Test specialists perform testing"
"Testing is done by an organization external to the company"
Answer: B
Question: 72
Which of the following is NOT a challenge with outsourcing?
Cultural differences
Quality
Employee turnover
Low cost
Answer: D
User: Sofia***** I chose killexams.com as my go-to resource for preparing for the istqb-advanced-level-3 exam, and it proved to be an excellent decision. The level of preparation I received was of top quality, which enabled me to achieve a score of 92%. I am thrilled with the outcome and grateful for the simplified arrangement of the material. killexams.com has helped me progress in my career. |
User: Gaston***** Thanks to Killexams.com, I managed to crack my istqb-advanced-level-3 exam on the first attempt with a score of 72.5% after just two days of preparation. Their valuable questions made the exam much less intimidating. I look forward to passing more exams with their help. |
User: Mitre***** I recently passed the ISTQB-ADVANCED-LEVEL-3 exam using Killexams.com package. This is an excellent choice for those who require quick yet reliable practice for the ISTQB-ADVANCED-LEVEL-3 exam. While practical experience is vital for this professional certification, Killexams.com exam simulator is the winner in terms of exam simulations. The simulator truly replicates the exam, including the specific question types. In my case, it contributed to my success as I achieved a perfect score of 100%. I was amazed! |
User: Gregory***** I am ecstatic to have passed my ISTQB-ADVANCED-LEVEL-3 cert exam with a score of 97%. The Killexams.com exam simulator and study material were crucial to my success. Thank you! |
User: Barbara***** I recently passed my istqb-advanced-level-3 exam and I owe my success to the reliable and accurate questions and answers provided by killexams.com. The majority of the exam questions came from this website, and I found that the answers were correct. I highly recommend using this site for your exam preparation needs. |
Features of iPass4sure ISTQB-Advanced-Level-3 Exam
- Files: PDF / Test Engine
- Premium Access
- Online Test Engine
- Instant download Access
- Comprehensive Q&A
- Success Rate
- Real Questions
- Updated Regularly
- Portable Files
- Unlimited Download
- 100% Secured
- Confidentiality: 100%
- Success Guarantee: 100%
- Any Hidden Cost: $0.00
- Auto Recharge: No
- Updates Intimation: by Email
- Technical Support: Free
- PDF Compatibility: Windows, Android, iOS, Linux
- Test Engine Compatibility: Mac / Windows / Android / iOS / Linux
Premium PDF with 70 Q&A
Get Full VersionAll ASTQB Exams
ASTQB ExamsCertification and Entry Test Exams
Complete exam list