QUESTION: 151
Can the Lead Network Operations Business Manager start operational delivery after the baseline shows an expected 30% negative gross margin?
No. Maximum accepted negative gross margin is 10%.
Yes. NSN needs to fulfill its obligations and execute operational service delivery anyway.
Yes. If the Cost Baseline is in line with the Business Case.
Only after the Cost Baseline is approved according to the required approval levels in the Region.
Answer: D
QUESTION: 152
Which of these Key Performance Indicators (KPI) supports the identification of possible cost overruns?
Project Cost Adherence (PCA)
Gross Margin (GM)
Actual Costs.
Forecast Costs (NELLE)
Answer: A
QUESTION: 153
Which team provides the majority of remote support to the GNOC regarding fault fixing?
Configuration Management.
Field Operations.
Performance Management.
Customer Care back office.
Answer: B
QUESTION: 154
You are supporting the review of the SLA's and are asked to advise the two 'Exemptions' that will have MOST impact. Which are the 2 with MOST impact?
Non aligned 3rd Party SLA's & NSN Customer Contract SLA's & Performance/Capacity limitations arising caused by special holidays.
Performance degradation caused by activities not approved by NSN & Planned downtime for activities necessary to maintain and optimise the network.
Planned downtime for activities necessary to maintain and optimise the network & Performance degradations caused by subcontractors.
Planned downtime for activities necessary to maintain and optimise the network & non aligned 3rd Party SLA's & NSN Customer Contract SLA's.
Answer: D
QUESTION: 155
You have a Trouble Ticketing system that has a limited capability, which other function can you use to assist you when calculating the SLA?
Configuration Management
OSS Management
Fault Management
Performance Management
Answer: D
QUESTION: 156
Which statement BEST describes the key requirements for setting up Field Operations tools and process?
Ensure effective Work Force Management and contractor Mgt process and tools.
Ensure effective Work Force Management and Subcontractor Mgt process and tools.
Ensure effective contractor management and Spare Part Management process and tools.
Ensure effective Work Force Management and Spare Part Management process and tools.
Answer: D
QUESTION: 157
The customer CTO calls you (The Technical Support Manager) directly to resolve a service outage in what he describes as strategically important area. What is the correct course of action?
Call out a Technical Support Engineer to immediately resolve the issue.
Request the NOC to raise an urgent TT for the issue.
Escalate to FLM.
Immediately advise the CT head of the situation and request advice for prioritisation.
Answer: B
Explanation:
21Apres - Time Management
QUESTION: 158
The customer has an urgent request for network tuning in a specific area due to significant cases of call drop, with the promise of increasing business opportunity in another area which is mainly in the hands of the other supplier (competitor), what's the correct way to answer this request?
It's a major network problem for which NSN could get the blame: therefore I will act to complete this additional service as soon as possible without hassling the customer with any administration.
This additional service improves the partnership between NSN and customer along with the high probability to increase the business and NSN's footprint. Therefore I will act to complete this additional service as soon as possible without a PO.
I assure the customer that NSN is going to solve the problem by our professional network planning and optimization service, but in order to obtain all required resources and tools, it's necessary to have a purchase order to start the activities.
I will escalate this customer request to the Customer Team and ask to approve the related risk order.
Answer: C
QUESTION: 159
What are the MOST critical requirements in Field Operations to ensure performance quality?
Planning maintenance 24x7 and having people available.
Making sure there are sufficient people and spare parts to fix faults.
Meeting response times with suitably qualified and resourced people for assigned Work Orders.
Ensuring there is a WFM system in place.
Answer: C
QUESTION: 160
Which Network Operations process utilises the majority of resources?
Performance Management.
Alarm Monitoring
Configuration Management.
Fault Management.
Answer: B
User: Sofiya*****![]() ![]() ![]() ![]() ![]() Killexams.com was my primary study resource for the SDM-2002001030 exam, helping me achieve a solid score. Their valid practice tests ensured I not only passed but also gained valuable knowledge, making me a stronger professional. I highly recommend their materials to anyone in the IT field. |
User: Leon*****![]() ![]() ![]() ![]() ![]() A heartfelt thank you to Killexams.com for their outstanding SDM-2002001030 exam resources. The online questions and case studies clarified difficult concepts, helping me score 81%. Their detailed explanations made all the difference, and I couldn’t have done it without them. |
User: Henry*****![]() ![]() ![]() ![]() ![]() The material from killexams.com was simple and easy to understand. It was more than sufficient to prepare me for the tough SDM-2002001030 exam. I honestly could not have passed it without their help, and I confidently answered 76 questions correctly in the real exam. |
User: Ali*****![]() ![]() ![]() ![]() ![]() I chose killexams.com to achieve the highest possible score in the sdm-2002001030 exam, and their testprep resources delivered. The valid and reliable materials allowed me to test myself thoroughly, ensuring I was well-prepared and scored exceptionally well, leaving a lasting impression. |
User: Tanny*****![]() ![]() ![]() ![]() ![]() When my father asked if I was at risk of failing my sdm-2002001030 exam, I confidently reassured him, thanks to killexams.com’s reliable testprep resources. Their study materials provided the clarity and structure I needed to prepare thoroughly, leading to a satisfactory pass. I am thankful for their support, which not only helped me succeed but also made my father proud of my accomplishment. |
Features of iPass4sure SDM-2002001030 Exam
- Files: PDF / Test Engine
- Premium Access
- Online Test Engine
- Instant download Access
- Comprehensive Q&A
- Success Rate
- Real Questions
- Updated Regularly
- Portable Files
- Unlimited Download
- 100% Secured
- Confidentiality: 100%
- Success Guarantee: 100%
- Any Hidden Cost: $0.00
- Auto Recharge: No
- Updates Intimation: by Email
- Technical Support: Free
- PDF Compatibility: Windows, Android, iOS, Linux
- Test Engine Compatibility: Mac / Windows / Android / iOS / Linux
Premium PDF with 160 Q&A
Get Full VersionAll Nokia Exams
Nokia ExamsCertification and Entry Test Exams
Complete exam list