Certification Practice Test | PDF Questions | Actual Questions | Test Engine | Pass4Sure
TM12 : ISTQB-BCS Certified Tester Advanced Level - Test Manager Exam
ASTQB TM12 Questions & Answers
Full Version: 250 Q&A
Latest TM12 Practice Tests with Actual Questions
Get Complete pool of questions with Premium PDF and Test Engine
Exam Code : TM12
Exam Name : ISTQB-BCS Certified Tester Advanced Level - Test Manager
Vendor Name :
"ASTQB"
TM12 Dumps TM12 Braindumps
TM12 Real Questions TM12 Practice Test TM12 Actual Questions
ASTQB
TM12
ISTQB-BCS Certified Tester Advanced Level - Test Manager
https://killexams.com/pass4sure/exam-detail/TM12
Does the tool support all the types of code coverage required from the three levels A, B, C of the DO-178B standard?
Does the tool have a good general usability?
What are the costs to qualify the tool as a verification tool under the DO-178B?
Is the installation procedure of the tool easy?
Does the tool require a system with more than 4GB of RAM memory?
Is the licensing scheme of the tool compatible with the confidentiality needs of the avionics company?
Answer: A, C, F
Question: 56
Test Tools and Automation
Assume you are a Test Manager involved in system testing of a CRM application for a Pay- TV company. Currently the application is able to support a proper number of users assuring the required responsiveness. Since the business is expected to grow, you have been asked to evaluate the ability of the application to grow to support more users while maintaining the same responsiveness.
Which of the following tools would you expect to be the most useful at performing this evaluation? Number of correct responses: 1 K21 credit
Coverage tools
Test management tools
Static analysis tools
Performance tools
Answer: D
Question: 57
Test Tools and Automation
Assume you are managing a test automation project for a mission-critical system. Becausevendor provided tools and open source solutions don't meet the needs of this project, you ask your test team to develop a custom automation framework.
Which of the following management issues associated to the development of this custom automation framework is least likely to manage?
Number of correct responses: 1 K21 credit
Proper testing for the custom automation framework must be performed
The custom automation framework will require an adequate documentation
The changes to the custom automation framework should be communicated to all external users of this tool under the GNU license
The custom automation framework will need proper maintenance
Answer: C
Question: 58
People Skills – Team Composition
Consider the following analysis of testing skillsperformed on four people: Alex, Robert, John and Mark (all the skills have been rated on an ascending scale: The higher the score, the better the skill):
Which of these people, based on this analysis, would you expect to be most suitable to work specifically as test designer? Number of correct responses: 1 K43 credits
Alex
Roberta
John
Mark
Answer: B
Question: 59
People Skills – Team Composition
Which of the following would you expect to be most likely an example of a demotivating factor for testers? Number of correct responses: 2 K21 credit
The management asks the testers to be kept informed about the intensity, quality and results of testing
The testers’ recommendations to improve the system or its testability are adopted by the development team
The same regressions tests are manually executed by the same testers, for every product release, without regression test tools
The testers are assessed on whether and how often they detect important and criticalfailures
Test quality is measured by counting the number of customer/user reported problems.
Answer: C, E
Question: 60
People Skills – Team Composition
Which of the following would you expect to be most likely an example of a motivating factor for testers? Number of correct responses: 1 K21 credit
The resources allocated for the testing activities are not sufficient and don’t allow the testers to contribute to the quality of the product
The testers contribution to the qualityof the software products developed from an organization is recognized with increased responsibilities
The same regressions tests are executed manually by the same testers, for every product release, without any progression in content
The testers areasked to perform, in parallel with their testing tasks, other tasks unrelated to their testing responsibilities
Answer: B
People Skills – Team Composition
Your test team consists of four members (Mary, Bob, Mark, Dave) with different inter personal skills.
The following skills assessment spreadsheet shows the characteristics of the team members with respect to a list of interpersonal-skills (for each characteristic only the member with the highest level of that characteristic is indicated and marked with ‘X’):
On the next project a member of your test team will have to perform some routine tasks requiring collaboration with other teams. Who in your test team would you expect to be most suitable at doing these tasks? Number of correct responses: 1
K43 credits
Mary
Bob
Mark
Dave
Answer: A
People Skills – Team Composition
An agile development team decides to hire a tester who has always worked:
in independent test teams, reporting the problems found in a defect tracking system
in safety-critical projects, with a stronger focus on the quality of the product than on time and budget. This agile team is focused on short-term goals to get the product released on time and within budget.
Which of the following answers would you expect to be most likely true in this scenario? Number of correct responses: 1
K21 credit
Agile teams like the presence of a tester in their teams and the tester will be able to adapt to the new context without any issue
The developerswill immediately follow the guidelines described by the tester
The tester can continue to report the problems found in a defect tracking system and be more focused on the quality than on time and budget constraints
The tester’s mission could be toverify adherence to requirements, instead of reporting formally the problems in a defect tracking system
Answer: D
Question: 63
You are using this skills assessment spreadsheet in order to define a training development plan for your test team.
Your objective is to fill the skill gaps by having at least a teammember rated as an expert
for each skill identified for the “technical expertise” and “testing skills” sections, and with the ability to train the other team members.
Considering the budget constraints you can send only one person to a training course.
Based only on the given information, which of the following answers would you expect to be the best option to achieve your objective? Number of correct responses: 1 K43 credits
Send Robert to a performance testing training course
Send Alex to a performance testing training course
Send John to a performance testing training course
Send Mark to a test automation training course
Answer: B
Question: 64
People Skills – Team Composition
Assume you are managing the system testing execution phase of a project.
The system test execution period for that project is scheduled for eighteen weeks and the release date is scheduled at the end of system testing.
During the sixth week of system test execution, at the staff meeting, the project manager informs you that the project deadlines are changed and the release date that is only three weeks ahead.
This new release will not allow the completion of the system tests. Suppose also that you have followed a risk- driven test approach for this project.
Which of the following statements represents the worst way to lead your test team in the
next three weeks? Number of correct responses: 1 K21 credit
Neglect your management activities and work side-by-side with your test team executing tests
Considering the executed tests, you should reduce the test coverage back on the risk analysis and adjust downward the priority of the associatedrisk items
Convince all the people of your test team that each of them is an important and needed member, and that their contribution is fundamental to the success of the team
Favor and encourage a proactive attitude where people ask for new tasks as soon as they finish their current tasks
Answer: A
Question: 65
Test Tools and Automation
In your organization the following tools of the same vendor are currently in use: a requirements management tool, a test management tool and a bug tracking tool.
You are the Test Manager.
You are currently evaluating a test automation tool of the same vendor (to complete the vendor's tool suite) against an interesting open-source test automation tool under the GNU GPL (General Public License).
There are no initial costs associated to that open-source tool.
Which of thefollowing statements associated to the selection of the open-source tool is correct in this scenario?
Number of correct responses: 1 K21 credit
The open-source tool can be modified but only if the community of developers of that tool gives you the formal permission to modify it
There are no initial costs for the open-source tool but you should carefully consider the costs associated to the integration with the existing tools and also evaluate the recurring costs
There are no initial costs for the open-source tool because open-source tools are usually low-quality, while vendor tools have always a better quality than the corresponding open- source tools
The open-source tool can be modified but it can’t be distributed further in any way
Answer: B
User: Sochi***** I was a lazy student who always looked for shortcuts and convenient methods to get by. However, when I started my IT course in tm12, I found it very challenging and could not find any helpful guide. Thats when I heard about killexams.com and decided to give it a try. Their sample and practice questions proved to be immensely useful, and I successfully secured good marks in my tm12 exam. All credit goes to Killexams for making it possible. |
User: Luda***** To test and prepare for my TM12 exam, I used the Killexams.com practice tests and exam simulator. Thanks to the Killexams.com team, I passed the TM12 exam with their support. I cannot believe I achieved such high marks and could not have done it without their help. Thank you very much! |
User: Ignace***** To become an tm12 Certified, passing the tm12 exam was my top priority. Unfortunately, I failed the exam twice, but luckily, I obtained the killexams.com material through my cousin, and it proved to be a game-changer for me. I scored 89% in the exam without any trouble, and I am delighted that the material was correctly formatted and enriched with necessary concepts. I believe that killexams.com is the best choice for those who wish to pass the tm12 exam smoothly. |
User: Taska***** Without killexams tm12 practice tests, questions, and answers, I would have failed the exam and wasted time and money. Although I was worried about a few questions, it was my fault for not memorizing and listening better. Nevertheless, I passed the tm12 exam with great scores, thanks to their help. |
User: Theodor***** killexams.com was a lifesaver for me during my exam preparation. As the exam dates were getting closer, I was getting more and more nervous. But thanks to the tm12 questions and answers that I downloaded and memorized, I passed with ease, answering 87 questions in just 80 minutes. killexams.com truly became my partner, and I will be forever grateful to them for their help. |
Features of iPass4sure TM12 Exam
- Files: PDF / Test Engine
- Premium Access
- Online Test Engine
- Instant download Access
- Comprehensive Q&A
- Success Rate
- Real Questions
- Updated Regularly
- Portable Files
- Unlimited Download
- 100% Secured
- Confidentiality: 100%
- Success Guarantee: 100%
- Any Hidden Cost: $0.00
- Auto Recharge: No
- Updates Intimation: by Email
- Technical Support: Free
- PDF Compatibility: Windows, Android, iOS, Linux
- Test Engine Compatibility: Mac / Windows / Android / iOS / Linux
Premium PDF with 250 Q&A
Get Full VersionAll ASTQB Exams
ASTQB ExamsCertification and Entry Test Exams
Complete exam list