e. It should be deployed using grid technology.
A. a and b
B. c and d
C. a, b and c
D. a and e
Answer: D
QUESTION: 42
In one of your less well-managed facilities there has been no control or guidance over
customer equipment installation in rack air flow management. Customers have therefore
installed some equipment which vents heated air into your designated cold aisles. What
does the Code of Conduct indicate you should do?
a. Increase the CRAC set point temperatures so that customers will begin to see the
advantage of air flow management.
b. Advise customers of the benefits to both to the equipment and environment of
managing airflow through installing equipment with airflow facing in the correct
direction and the use blanking plates.
c. Clearly label hot and cold aisles. Notify customers of the requirement for both
hot/cold aisle orientation for all new equipment installation.
d. Customer racks are outside of your control so you cannot influence hot/cold aisle
layout or in rack air flow management.
A. a and c
B. d only
C. b and c
D. a and b
Answer: C
QUESTION: 43
21
A large customer is moving out and leaving an entire data hall completely empty. A new
customer will be taking over the entire space in 3 months giving you the opportunity to
implement better practices in the meantime. Which of the following is an Expected
Practice in the Code of Conduct?
a. The consideration of return air plenums to return heated air to the air conditioning
units.
b. The installation of draught excluders or cover plates to cover all air leakage
opportunities in the new customer racks.
c. The deployment of equipment with substantially different environmental requirements
in separate areas of the data hall.
d. The replacement of solid doors on racks with partially perforated doors.
A. a and d
B. b and d
C. a, b, c and d
D. b and c
Answer: B
QUESTION: 44
A High Performance Computing environment is about to be installed in your facility.
According to the Code of Conduct, which of the following statements is the MOST
correct?
A. Install variable speed fans in your CRAC units to cope with the extra load.
B. Raise the temperature and humidity set points of your cooling system.
C. Review the placement of floor venting tiles in the area where the HPC will be
installed.
D. Increase the maintenance visits for the CRAC units to keep them at full efficiency.
Answer: C
QUESTION: 45
22

You have installed a new customer's equipment in your data centre. Without any other
changes, your monitoring as described in the Code of Conduct informs you that your
total IT load has now declined by 20%. Which of the following statements is correct?
A. The DCIE of the facility will improve by the proportion of the IT load over Total
facility energy consumption
B. The DCIE of the facility will improve by 20%.
C. The DCIE of the facility will not change
D. The DCIE of the facility will decline
Answer: D
QUESTION: 46
The office staff in your company are about to be given a networked drive on which they
can store files. This data will be kept on servers in your facility. According to the Code
of Conduct, which of the following should you carry out first?
A. Virtualise the servers hosting the data.
B. Inform users exactly how much and what they can store on their network drive.
C. Select energy efficient storage devices for hosting the data.
D. Delete unused files after 3 months.
Answer: B
QUESTION: 47

23
You provide support from the rack up to and including the customers operating system
and some applications. Which of the following practices are Expected for new customer
implementations?
a. To adapt your supported hardware to maximise its efficiency.
b. To eliminate traditional 2N hardware clusters from your product range.
c. To adapt your supported software to maximise its efficiency.
d. To actively encourage customers to virtualise new implementations.
A. a and d
B. a, b and d
C. b and c
D. a, c and d
Answer: D
QUESTION: 48
You will be installing two new services in your facility; the first is an internal time-
tracking application for billing customers and the second is a database of invoices
required for an annual audit. When designing the installation and support of these
services, which of the following statements are correct according to the Code of
Conduct?
a. Install the database in a hardware cluster.
b. Install the time-tracking application in a hardware cluster.
c. Install the database on a stand-alone server.
d. Install the tracking application on a stand-alone server.
e. Install both applications with their own dedicated backup machines.
A. a and b
B. b and d
C. b and c
D. b. c and d
Answer: C
QUESTION: 49
24

Six months ago the facility suffered a major outage and your company was forced to
suspend operations while its hosted applications were offline. The Company Board has
now given you budget to create a Disaster Recovery (DR) facility. When designing this
DR facility, which of the following statements describes the correct approach?
A. Build the DR facility to incorporate the latest energy efficient infrastructure.
B. Mirror all of the company's applications in the new facility.
C. Put all of the equipment in the DR facility on cold standby.
D. Audit your hosted applications to determine business impact and mirror only those
applications which are essential.
Answer: D
QUESTION: 50
What level of energy use reporting is the MINIMUM required by the Code of Conduct?
a. Incoming energy consumption meter.
b. PDU level metering of IT energy consumption.
c. IT Energy consumption meter.
d. Room level metering of supply air and temperature.
A. a and b
B. a and c
C. b and c
D. b and d
Answer: B

25

User: Philip*****

My roommate and I used killexams.com to prepare for our eucoc exam, and we both agreed that it was the best online resource available. We were both happy with our results, and I performed exceptionally well. Thanks to killexams.com for providing us with the guidance we needed to succeed.
User: Benjamin*****

To become EUCOC certified, I needed to pass the EUCOC exam. I failed the exam twice before accidentally stumbling upon Killexams.com through my cousin. I was very impressed by the Questions and Answers material, and it helped me secure 89% in the exam. The material was correctly formatted and enriched with essential requirements, making it easy for me to understand the concepts. I highly recommend Killexams.com to anyone looking to prepare for exams.
User: Ayden*****

I struggled to manage my preparation time for the eucoc exam, with only 10 days left. Thankfully, killexams.com helped me tremendously and made the exam smoother for me. The way the exam topics were presented and addressed in their material resulted in a score of 959.
User: Agustina*****

After trying several books for exam eucoc, I was disappointed with the materials. I needed a well-organized guideline with easy-to-understand content. Killexams.com Questions and Answers exceeded my expectations and helped me score 89% on the real exam. Thank you, Killexams.com, for your excellent guidance!
User: Sergei*****

When I failed my EUCOC exam, I found killexams.com online and decided to try their coaching package containing questions, answers, and an exam simulator. Thanks to their team, I scored 98% and passed the exam.

Features of iPass4sure EUCOC Exam

  • Files: PDF / Test Engine
  • Premium Access
  • Online Test Engine
  • Instant download Access
  • Comprehensive Q&A
  • Success Rate
  • Real Questions
  • Updated Regularly
  • Portable Files
  • Unlimited Download
  • 100% Secured
  • Confidentiality: 100%
  • Success Guarantee: 100%
  • Any Hidden Cost: $0.00
  • Auto Recharge: No
  • Updates Intimation: by Email
  • Technical Support: Free
  • PDF Compatibility: Windows, Android, iOS, Linux
  • Test Engine Compatibility: Mac / Windows / Android / iOS / Linux

Premium PDF with 50 Q&A

Get Full Version

All ISEB Exams

ISEB Exams

Certification and Entry Test Exams

Complete exam list