Certification Practice Test | PDF Questions | Actual Questions | Test Engine | Pass4Sure
HPE0-S58 : Implementing HPE Composable Infrastructure Solutions Exam

HP HPE0-S58 Questions & Answers
Full Version: 85 Q&A
HPE0-S58 Dumps HPE0-S58 Braindumps
HPE0-S58 Real Questions HPE0-S58 Practice Test HPE0-S58 Actual Questions
killexams.com
HP
HPE0-S58
Implementing HPE Composable Infrastructure Solutions
https://killexams.com/pass4sure/exam-detail/HPE0-S58
Question: 72
A customer needs to aggregate uplink ports from two Virtual Connect interconnects to increase bandwidth and availability of the networks configured for HPE Synergy platform.
Which steps must the integrator perform in the configuration to meet the customers needs?
1. Connect Satellite modules using Ports L1 and L4
2. Connect Ports Q7 and Q8 on the Master interconnect Modules (ICM)
3. Install Redundant Frame Link Modules and a second management ring
4. Enable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules
Answer: A
Question: 73
Which component of the HPE Synergy solution should you use to set the firmware/driver baseline and the installation method for Synergy Compute nodes?
1. Composer
2. Smart Update
3. Image Streamer
4. Global Dashboard
Answer: B
Reference: https://support.hpe.com/hpsc/doc/public/display?docId=c05212310
Question: 74
Which storage solution can be used for volume provisioning using HPE Composer?
1. MSA 2040
2. HPE StoreEasy 1560
3. HPE 3PAR StoreServ
4. HPE XP7 Storage
Answer: C
Reference: https://www.karma-group.ru/upload/iblock/30b/hpe_synergy_composer.pdf
Question: 75
An integrator prepares deployment documents with the list of all the hardware and software components. The integrator also needs a list of all infrastructure services deployed, with the functionality described.
Which services are provided by the vCenter Server component and should be placed in the report? (Choose two.)
1. Auto Deploy
2. Single Sign-On
3. Update Manager
4. Lookup Service
5. Certificate Authority
Answer: CD
Question: 76
A customer needs to evaluate Image Streamer as Proof-of-Concept (PoC) in a test and development tab environment. At a minimum, what does a Synergy integrator need in order to support this requirement?
1. a three-frame environment with redundant composer and Image Streamer appliances
2. a single frame with single composer and Image Streamer appliances
3. a two-frame environment with single composer and Image Streamer appliances
4. a single frame with redundant Image Streamer appliances
Answer: B
Question: 77
An integrator is installing three Synergy frames in different locations for a customer. As part of the installation, the customer requests a single monitoring dashboard that shows the current hardware status, warranty status, and open support cases of all three frames.
Which configuration steps must the integrator perform to provide the customer with this functionality?
1. Enable Remote Support and Insight Online Integration in the Composer UI
2. Install Insight Remote Support Advanced, and integrate it with HPE Global Dashboard
3. Configure OneView with iLO Amplifier pack
4. Activate iLO Federation on all installed compute nodes
Answer: C
Question: 78
What are valid uses for an IPv4 address pool when configuring an HPE Synergy solution? (Choose two.)
1. assignment of IP addresses for NICs in an operating system
2. assignment of IP addresses for Composer appliances
3. assignment of IP addresses for PXE booting to a deployment server
4. assignment of IP addresses for interconnect modules
5. assignment of IP addresses for iLOs
Answer: DE
Reference: https://techlibrary.hpe.com/docs/synergy/shared/setup_overview/index.html
Question: 79
Which policy can an integrator apply when creating a datastore using HPE OneView for vCenter Server?
1. Data at Rest encryption policy
2. Round Robin load balancing policy
3. Recovery Manager Central policy
4. virtual machine Restart policy
Answer: C
Question: 80
Refer to the exhibit.
How should an integrator pair interconnect bays to set up redundant fabrics in an HPE Synergy 12000 Frame?
1. Interconnect bays 1 and 2; bays 3 and 4; bays 5 and 6.
2. Interconnect bays 1 and 6; bays 2 and 5; bays 3 and 4.
3. Interconnect bays 1 and 4; bays 2 and 5; bays 3 and 6.
4. Interconnect bays 1 and 3; bays 2 and 4; bays 5 and 6.
Answer: C
Reference: https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04815113.pdf
Question: 81
Refer to the exhibit.
An integrator needs to add an FCoE connection to the server profile, but the FCoE connection type is not available.
What is the likely cause of this issue?
1. FCoE capable interconnect modules are not installed in the Synergy frame
2. Defined FCoE network is not associated with a SAN or does not have VLAN Id defined
3. A FCoE connection is not available, as there is no LIG configured for FCoE connectivity
4. The FCoE connection has not been added as a Fibre Channel connection within a server profile
Answer: D
Question: 82
In a 3-frame HPE Synergy environment, how should an integrator place the image Streamer modules to allow for redundancy to all of the management connections?
1. one Image Streamer module in frame 2, and a second Image Streamer Module in frame 3 (2 total)
2. two Image Streamer modules in frame 2, and two Image Streamer modules in frame 3 (4 total)
3. one Image Streamer module in each Synergy frame (3 total)
4. two Image Streamer modules in frame 1 (2 total)
Answer: B
Reference: https://www.karma-group.ru/upload/iblock/2be/synergy_image_streamer.pdf (page 7)
Question: 83
What must an integrator do before an existing cluster can be imported to the HPE Composer?
1. The vCenter Server must be integrated with the HPE Composer
2. The cluster must be vSAN enabled
3. The HPE Composer must have at least two management interfaces to connect to the cluster
4. The cluster must be enabled for HPE Composer integration
Answer: A
Question: 84
During an initial setup of a Synergy environment, an integrator needs to enable or disable authorized Service access. What will be the outcome when the integrator disables this service?
1. Authenticated administrators will be unable to make changes to the system
2. Authorized users will be unable to generate a support dump
3. Authenticated administrators will be unable to access the system
4. Authorized support will be unable to diagnose the system
Answer: D
Reference: https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-c05098314 (62)
Question: 85
FILL BLANK
A customer has the following configuration: Frame 1
* Bay 1 HPE Synergy 12Gb SAS Connection Module
* Bay 2
* Bay 3 HPE Virtual Connect SE 40 GB F8 Module
* Bay 4 HPE Synergy 12GB SAS Connection Module
* Bay 5
* Bay 6 HPE Synergy 10 Gb Interconnect Link Module Frame 2
* Bay 1 HPE Synergy 12Gb SAS Connection Module
* Bay 2
* Bay 3 HPE Synergy 10Gb Interconnect Link Module
* Bay 4 HPE Synergy 12Gb SAS Connection Module
* Bay 5
* Bay 6 HPE Virtual Connect SE 40Gb F8 Module
How many more frames can the customer add to their Synergy composable fabric? (Note: Enter your answer in the answer field below.)
A. See explanation below.
Answer: A
Frame 1 Bay 2 HPE Virtual Connect SE 100Gb F32 Module for Synergy (867796-B21)
Frame 1 Bay 5 HPE Virtual Connect SE 16Gb Fibre Channel Module for Synergy (779227-B21)
Frame 2 Bay 2 Brocade 16Gb/24 Power Pack+ Fibre Channel SAN Switch Module for HPE Synergy (K2Q86A) Frame 2 Bay 5 HPE Synergy 4820C 10/20/25Gb Converged Network Adapter (876449-B21)
User: Svetlana*****![]() ![]() ![]() ![]() ![]() With my hpe0-s58 exam approaching, I felt lost in my books and overwhelmed by the material. In desperation, I turned to Killexams.com, and it was the best decision I could have made. Their resources helped me breeze through the exam with a great score. Thank you for your invaluable support! |
User: Izz*****![]() ![]() ![]() ![]() ![]() I initially encountered issues with killexams.comβs hpe0-s58 testprep materials due to a file error, but their team quickly resolved it. Once corrected, the exam simulator proved highly effective, helping me prepare thoroughly and pass the exam with confidence. I appreciate their prompt support and reliable resources. |
User: Daniel*****![]() ![]() ![]() ![]() ![]() Testprep guide was a quick and effective reference, helping me score an 88% on the hpe0-s58 exam. Their concise answers covered all topics, making three-week preparation manageable. I now rely on their resources for all future exams. |
User: Nayda*****![]() ![]() ![]() ![]() ![]() Test guide was a game-changer for my hpe0-s58 exam, handling the material superbly and helping me score 89% despite being a slow learner. Their excellent resources made me feel on top of the world after passing. |
User: Mia*****![]() ![]() ![]() ![]() ![]() Before joining killexams.com, I struggled with hpe0-s58 practice questions and failed despite ample study time. Their testprep books and example questions were convincing and comprehensive, covering the entire syllabus. I passed with ease, thanks to their exceptional resources. |
Features of iPass4sure HPE0-S58 Exam
- Files: PDF / Test Engine
- Premium Access
- Online Test Engine
- Instant download Access
- Comprehensive Q&A
- Success Rate
- Real Questions
- Updated Regularly
- Portable Files
- Unlimited Download
- 100% Secured
- Confidentiality: 100%
- Success Guarantee: 100%
- Any Hidden Cost: $0.00
- Auto Recharge: No
- Updates Intimation: by Email
- Technical Support: Free
- PDF Compatibility: Windows, Android, iOS, Linux
- Test Engine Compatibility: Mac / Windows / Android / iOS / Linux
Premium PDF with 85 Q&A
Get Full VersionAll HP Exams
HP ExamsCertification and Entry Test Exams
Complete exam list