Certification Practice Test | PDF Questions | Actual Questions | Test Engine | Pass4Sure
ISTQB-Level-1 : American Software Testing Qualifications Board Level 1 Exam
ASTQB ISTQB-Level-1 Questions & Answers
Full Version: 827 Q&A
ISTQB-Level-1 Dumps
ISTQB-Level-1 Braindumps
ISTQB-Level-1 Real Questions
ISTQB-Level-1 Practice Test
ISTQB-Level-1 Actual Questions
ASTQB
ISTQB-Level-1
American Software Testing Qualifications Board Level
1
https://killexams.com/pass4sure/exam-detail/ISTQB-Level-1
QUESTION: 46
Comparing TMMi and TPI, which is not a valid reason for choosing either TPI or
TMMi? 2 credits
A. If the scope of test performance improvement covers all test levels, TMMi is
preferred since TPI focusses mainly on black-box testing.
B. If the organization is already applying CMMI, TMMi may be preferred since it
has the same structure and uses the same terminology. TMMi addresses
management commitment very strongly and is therefore more suitable to support a
top-down improvement process.
C. TPI is much more a bottom-up model that is suitable for addressing test topics for
a specific (test) project.
D. TMMi can only be used with the traditional V model,whereas TPI can be used
with all types of software life cycles.
Answer: D
QUESTION: 47
A test assessment has been carried out using the selected model as a reference
framework. A number of recommendations have been identified and you are asked
to prioritize them. Based on your knowledge of the project, you are expecting
severe resistance to change. Which of the following would be the most important
selection criterion for defining the priority of the recommendations? 2 credits
A. Synchronized with the overall long-term organizational strategy
B. Defined according to the maturity model used
C. Most visible to stakeholders
D. Low costs actions first
Answer: C
Section 14: Sec Fourteen (48 to 49)
Details:Topic 8, Scenario 8, V2 "Test Proems Improvement'
You have raised the issue that improving the testing process is also dependent on the
status of the software development process.
QUESTION: 48
During test process improvement it is recommended to use standards where
possible. Standards originate from various sources and they cover different subjects
21
in relation to testing Pick TWO sources of software standards, useful to software
testing from the ones mentioned below. 1 credit
A. ISO 9126-1 ‘Software engineering- Product quality Part 1:
Quality model’ is an international standard, that provides a basis on which to
define quality assurance solutions.
B. ISA 4126-1 ‘Software engineering- Product quality Part 1:
Quality model’ is an international standard, that provides a basis on which to
define quality assurance solutions.
C. BS-7925-2 ‘Software testing. Software component testing is a national
standard used internationally. It covers a number of testing techniques that may be
useful both on component testing level and on system testing level.
D. SY-395-01 ‘Standard for East Coast Hospital software’ is a regional standard
adapted from a national one. Besides hospital software, this standard ought to be
used also by other types of software system in the region.
E. IEEE 829 ‘standard for software test documentation’ is an international standard
to be following mandatory by all testing origination regardless of lifecycle models.
Answer: A, C
QUESTION: 49
Which of the following phases in the fundamental test process is considered to
deliver a document which can be used as a major input for test process
improvement? 1 credit
A. Test planning and control
B. Test implementation & execution
C. Evaluating exit criteria and reporting
D. Test project closure
Answer: D
Section 15: Sec Fifteen (50 to 53)
Details:Topic 9, Scenario 9 "Test Management Documentation"
A software house is concerned about the number of defects found in software
released to its customers. They are starting to plan a new software product. In the
past, releases have often been stopped due to poor planning and too many defects
found during high level testing. You have been recruited to the newly created
22
position of test manager and asked to develop a test strategy, manage the testing of
the project and organize the resources needed to carry out the testing.
QUESTION: 50
Which THREE activities would be valid steps during the development of the test
strategy?2 credits (2 out of 3 correct 1 credit)
A. Identify test staff members that will be involved in the system test
B. Define test career paths
C. Understand the software development life cycle used by the software house
D. Assess the testing that needs to be done to minimize the risks
E. Issue the test strategy document for review
F. Define a master test plan template
G. Perform a project risk analysis
Answer: C, D, E
QUESTION: 51
As part of the test strategy, entry and exit criteria will be defined for each test level.
Which is NOT a valid reason for using entry and exit criteria? 1 credit
A. The expectation is that development testing is not adequate.
B. Exit criteria are used to decide on when to stop testing.
C. Entry and exit criteria are a principal way for getting adequate resources.
D. Using entry and exit criteria will prevent software that is not or poorly tested
from going to the next test level.
Answer: C
QUESTION: 52
Within the projects, a master test plan and phase test plan will be used. Following
is a list of characteristics applicable for test plans:
a. Any deviation from the procedures described in the test strategy document b. The
overall estimated costs, timescales and resource requirements
c. A detailed schedule of testing activities
d. The development deliverables to be tested
e. Which test staff members (names) will be involved and when f. Level of
requirements coverage achieved
23
Which THREE of the above mentioned characteristics relate to the master test plan?
1 credit
A. a
B. b
C. c
D. d
E. e
F. f
Answer: A, B, D
QUESTION: 53
Within the projects, a master test plan and phase test plan will be used. Following
is a list of characteristics applicable for test plans:
a. Any deviation from the procedures described in the test b. strategy document
c. The overall estimated costs, timescales and resource d. requirements
e. A detailed schedule of testing activities
f. The development deliverables to be tested
g. Which test staff members (names) will be involved and when h. Level of
requirements coverage achieved
Which TWO of the above mentioned characteristics relate to the phase test plan? 1
credit
A. a
B. b
C. c
D. d
E. e
F. f
Answer: C, E
Section 16: Sec Sixteen (54 to 55)
Details:Topic 10, Scenario 10, V1 "Online Application"
There is a formal requirement from the business to develop an additional on-line
application to the company website which will allow existing policyholders to
extend their cover for short-term foreign use of their vehicle overseas. The current
manual process will be retained. The application must be implemented in months
time in line with the marketing department's green initiative, which is anticipated to
generate a significant increase in demand.
24
The development manager has insufficient resources to meet this request and
has issued an invitation to potential bidders so that the development work can be
outsourced.
The application must initially cover Western Europe, and later Eastern Europe,
Russia, the Middle East, the Far East and Africa. A decision has yet to be made with
respect to Australia, New Zealand, North and South America.
You have been asked to ensure the quality and suitability of the document sent to
potential bidders and also that the application delivered by the successful bidder is
‘Tit for purpose’.
QUESTION: 54
Which of the following product risks would be most effectively addressed just by
static testing? 3 credits
A. In the delivered application, one of the countries, as specified in the
requirements, has not been correctly implemented.
B. The application takes too long to process a request for additional cover.
C. The test cases do not cover the key requirements.
D. The successful bidder may not deliver all the required functionality on time.
Answer: C
QUESTION: 55
The development manager is managing the review of the responses received from
bidders, and has asked the in-house test manager to provide a review checklist for
the test management aspects of the responses. Which of the following checkpoints
would be appropriate? 2 credits
A. The bidder’s test policy should enforce that incident management fully conforms
to IEEE 1044.
B. The bidder’s project strategy shows that the data content of all the test
environments conforms to EU standards.
C. The bidder’s test plan shows that the application will be delivered for acceptance
in six months time.
D. The bidder’s project test plan depicts a phased implementation with later delivery
dates to be confirmed and states that test deliverables will be developed using IEEE
829 as a guide.
Answer: D
25
Section 17: Sec Seventeen (56 to 56)
Details:Topic 10, Scenario 10, V2 "Online Application"
While waiting for the responses, the test manager has been asked to prepare test
plans to validate the software application delivered by the successful bidder.
QUESTION: 56
Which one of the following estimation approaches is appropriate at this stage of the
project? 2 credits
A. Create an estimate based on the function point analysis technique and test point
analysis
B. Create an estimate based on the complexity of the code
C. Create an estimate based on the credentials of the successful bidder
D. Create an estimate based on a percentage of the development effort
Answer: A
Section 18: Sec Eighteen (57 to 60)
Details:Topic 10, Scenario 10, V3 "Online Application"
The cancellation of a current major development project has released resources. The
development manager has decided to respond to his own request to tender and
has proposed an in-house development with the use of a Rapid Application
Development (RAO) approach.
QUESTION: 57
Why might a RAD approach be a better option for the test manager rather than a
sequential development? 2 credits
A. It will extend the development team’s abilities and enhance future delivery
capabilities.
B. It will allow the marketing, clerical and testing staff to validate and verify the
early screen prototypes.
C. Time-box constraints will guarantee code releases are delivered on schedule.
D. More time can be spent on test execution as less formal documentation is
required.
Answer: B
26
QUESTION: 58
Which of the following is NOT a typical key challenge for testing in a RAD based
development approach? 1 credit
A. Re-usable test scripts for (automated) regression testing
B. Project management and control
C. No complete requirements specification
D. Time-boxing
Answer: B
QUESTION: 59
As a result of the RAD based development approach, the test manager has decided
to change the risk mitigation approach. Which test technique might be most
appropriate to use? 2 credits
A. Decision Table Testing
B. Boundary Value Analysis
C. Error Guessing
D. Exploratory Testing
Answer: D
QUESTION: 60
The business has asked for a weekly progress report. Which of the following would
be appropriate as a measure of test coverage? 2 credits
A. Percentage of business requirements exercised
B. Percentage of planned hours worked this week
C. Percentage of countries that have test scenarios
D. Percentage of test iterations completed
Answer: A
Section 19: Sec Nineteen (61 to 61)
27
Details:Topic 11, Scenario 11 "Incident Management"
The following is the current incident handling process in used at the company. Step
1: Incident is documented in the incident Tile with the following information:
- Software module or area where the fault occurred
- Who has reported the fault
- Hardware configuration used for the test that found the fault
- The sequential incident number (1 greater than the last one recorded) Step 2:
Developer assigned to fix the fault
Step 3: Developer fixes the fault
Step 4: Developer signs off the incident as closed, and it is then removed from the
incident file
QUESTION: 61
Regarding the process described above, what is the most important recommendation
you would make using IEEE 1044 as a guide? 2 credits
A. No priority or severity assigned
B. Incident numbering is manual rather than automated
C. No mentioning of reproduceability
D. No classification on type of incident
Answer: A
Section 20: Sec Twenty (62 to 65)
Details:Topic 12, Scenario 12 “Automatic Teller Machine (ATM)”
You are a test manager in charge of integration, system and acceptance testing for a
bank. You are working on a project to upgrade an existing ATM to allow customers
to obtain cash advances from supported credit cards. The system should allow cash
advances from €20 to €500, inclusively, for all supported credit cards. The
supported credit cards are American Express, VISA, Eurocard and Mastercard.
In the master test plan the following items are listed in the section named “items
and/or features to be tested”:
I All supported credit cards
II Language localization
II Valid and invalid advances
IV Usability
V Response time
QUESTION: 62
28
Relying only on the information provided in the scenario, select the TWO items
and/or features for which sufficient information is available to proceed with test
design. 2 credits
A. All supported credit cards
B. Language localization
C. Valid and invalid advances
D. Usability
E. Response time
Answer: A,
QUESTION: 63
Continuing with the Scenario described in the previous question, which of the
following topics would you need to address in detail in the master test plan? 3
credits
A. An approach to regression testing
B. A list of boundary values for “advance amount”
C. A description of dependencies between test cases
D. A logical collection of test cases
Answer: A
QUESTION: 64
Given the following figures for the testing on a project, and assuming the failure rate
for initial tests remains constant and that all retests pass, what number of tests
remain to be run? 3 credits
A. 700
B. 720
C. 784
D. 570
29
Answer: B
QUESTION: 65
Given is the following defect removal chart reported at the end of system testing -
showing total defects detected and closed defects (fixed and successfully retested).
A number of open defects are classified as critical. All tests have been executed.
Based on the chart above, what is the most appropriate next test phase? 1 credit
A. Acceptance testing to verify the business process
B. Acceptance testing to verify operational requirements
C. Requirements testing as part of testing regulatory compliance
D. Another system test cycle to verify defect resolution
Answer: D
30
User: Iman***** Despite trying several books, I was disappointed that I could not find the right study materials. I was looking for a comprehensive guide to prepare for the ISTQB-LEVEL-1 exam, with easy-to-understand and well-organized content. Thankfully, Killexams.com Questions and Answers met my needs perfectly by explaining complex topics in a simple manner. I exceeded my own expectations by achieving a score of 89% on the real exam. Thank you, Killexams.com, for providing such an excellent guide. |
User: Harper***** When I was searching for an internet exam simulator to take my istqb-level-1 exam, Killexams.com came to my rescue. I answered all the questions within just 90 minutes. The study material had all the important practice tests that were required for the exam, which made the exam preparation a lot easier for me. Initially, I was hesitant to use Killexams.com Questions and Answers, but after downloading the demos, I realized that it could provide me with the right help for the istqb-level-1 exam. |
User: Jayden***** I would like to thank the team at Killexams.com for making my attempt at the istqb-level-1 exam so easy. I received a score of 76%, and I highly recommend new customers to use Killexams.com because it is very comprehensive. |
User: JoaquĂn***** I recently passed the istqb-level-1 exam using Killexams.com package. This is an excellent choice for those who require quick yet reliable practice for the istqb-level-1 exam. While practical experience is vital for this professional certification, Killexams.com exam simulator is the winner in terms of exam simulations. The simulator truly replicates the exam, including the specific question types. In my case, it contributed to my success as I achieved a perfect score of 100%. I was amazed! |
User: Alba***** The materials provided by Killexams.com are up-to-date and reliable. I answered each question correctly in the actual exam after practicing with their exam simulator, which thoroughly prepared me. I achieved a remarkable score of 98% thanks to the resources available on Killexams.com. |
Features of iPass4sure ISTQB-Level-1 Exam
- Files: PDF / Test Engine
- Premium Access
- Online Test Engine
- Instant download Access
- Comprehensive Q&A
- Success Rate
- Real Questions
- Updated Regularly
- Portable Files
- Unlimited Download
- 100% Secured
- Confidentiality: 100%
- Success Guarantee: 100%
- Any Hidden Cost: $0.00
- Auto Recharge: No
- Updates Intimation: by Email
- Technical Support: Free
- PDF Compatibility: Windows, Android, iOS, Linux
- Test Engine Compatibility: Mac / Windows / Android / iOS / Linux
Premium PDF with 827 Q&A
Get Full VersionAll ASTQB Exams
ASTQB ExamsCertification and Entry Test Exams
Complete exam list