Question: 188
A stakeholder wants to modify an existing feature. Which of the following would be used to determine the scope of the change on the
product?
A. Sequence diagram
B. Requirements traceability matrix
C. Requirements attributes table
D. Project schedule and cost baseline
Answer: B
Reference: https://opentextbc.ca/projectmanagement/chapter/chapter-9-scope-planning-project-management/
Question: 189
A company’s management team has decided to deploy a new product. However, there is concern that users may not accept a new product that
forces them to change existing practices.
The business analyst should:
A. adhere to the project plan to achieve project objectives.
B. clearly communicate project objectives and attempt to defuse tensions.
C. delay the application’s deployment until the conflicts have been resolved.
D. voice user concerns to management and recommend that the project be closed.
Answer: B
Question: 190
A company is developing a new e-commerce platform to enter a new market segment. Development is well under way when the government
issues a new set of regulations.
Which course of action should the business analyst take?
A. Check the traceability matrix to identify affected use cases.
B. Evaluate if the new set of regulations is aligned with the business case.
C. Evaluate the impact of the change on the project schedule.
D. Obtain management sign-off on the new set of regulations.
Answer: C
Question: 191
Requirements elicitation for a project is occurring. The marketing, acquisition, and production departments want to include specific
requirements. The CEO has a requirement to deploy in three months.
Which of the following actions will have a greater influence on the project success?
A. Estimate the effort required for each requirement and develop as many functionalities as possible.
B. Prioritize and develop the requirements of the marketing department since the project will impact a greater number of people.
C. Conduct a stakeholder analysis and balance requirements by understanding the relative power associated with each stakeholder
group.
D. Explain the situation to the CEO and try to obtain an extension of the contract for the actual time necessary to develop the system.
Answer: C
Question: 192
A business analyst is reviewing a discrepancy report after a test session. The discrepancy report has revealed a defect that the business analyst
must address.
Which of the following criteria should the business analyst use to identify the appropriate response to the defective test result?
A. Perform an impact analysis and open a change request to include the revised requirement in the next baseline.
B. Inspect the requirements traceability matrix to verify if the requirement is connected to a use case.
C. Determine if the defect is in the solution developed, in the original requirement or in the test case.
D. Verify that the corresponding requirement was appropriately signed off by the requesting stakeholder.
Answer: C
Reference: https://www.wisdomjobs.com/e-university/business-analyst-tutorial-3/validate-solution-12447.html
Question: 193
During validation of a project solution, the business analyst discovers that a requirement has been altered. Instead of placing the company logo
in the upper-left corner of the window, it is displayed in the upper-right corner. When the business analyst asks the developer about the
change, the developer says that one of the stakeholders asked directly for the change.
Which correct action should the business analyst take?
A. Confront the stakeholder that requested the change.
B. Follow the change control process as defined in the business analysis plan.
C. Discuss the change in the next stakeholder meeting.
D. Ask the developer to correct the logo as stated in the requirement.
Answer: C
Question: 194
A business analyst is conducting a cost-benefit analysis of potential solution options. The stakeholders have indicated that the estimated
growth rate is very important to them.
Which technique will allow the business analyst to determine this information?
A. Net present value (NPV)
B. Payback period
C. Return on investment (ROI)
D. Internal rate of return
Answer: A
Question: 195
During user acceptance testing, a defect is logged by a user from a department that did not participate in the requirements analysis. To avoid
this situation and minimize impact on the project, the user should have been:
A. interviewed to understand how the user’s work would be impacted.
B. involved in the development and sign-off of the business requirements.
C. given the opportunity to review the user acceptance test scripts.
D. identified as a stakeholder as part of the stakeholder analysis.
Answer: D
Question: 196
A business analyst is leading a project to implement automated order entry software at a local pizza restaurant. The business analyst has very
little information about the project: the ordering process takes too long and often ends in incorrect orders.
What step should the business analyst take next?
A. Identify testing resources to support the implementation.
B. Request information on the current ordering process and compare it with other companies.
C. Select the software to implement and start working with the technical resources.
D. Schedule a requirements gathering sessions with the manager of the ordering department.
Answer: D
Question: 197
After a project was delivered, the business analyst learns of a project objective with no associated requirement. What would have helped
determine this issue before delivery?
A. Context diagram
B. Use cases
C. Tracing requirements
D. Process flow
Answer: C
Reference: https://www.pmi.org/learning/library/top-five-causes-scope-creep-6675
Question: 198
A business analyst has been asked to investigate a problem. This investigation will provide input towards developing a business case. The
business analyst wants to first understand the company’s current business processes.
Which technique should the business analyst use?
A. MoSCoW
B. RACI matrix
C. Observation
D. User stories
Answer: C
Reference: https://kissflow.com/bpm/business-process-analysis/
Question: 199
The customer and the business analyst are collaborating in the development of a solution scope. It is important for the customer to:
A. spend the time required to provide, clarify, and elaborate requirements.
B. communicate changes to requirements only when they are completely defined.
C. perform an alternatives analysis for requirements implementation.
D. challenge assessments of the cost and feasibility of requirements.
Answer: A
Question: 200
A business analyst is developing a traceability matrix to determine whether or not any gaps exist and to identify any discrepancies.
Which critical field is needed to ensure that the traceability matrix is usable?
A. Hierarchy
B. Requirements description
C. Status
D. Owner
Answer: B
Reference: https://www.softwaretestinghelp.com/requirements-traceability-matrix/
For More exams visit https://killexams.com/vendors-exam-list
Kill your exam at First Attempt....Guaranteed!
User: Tonja***** I thank killexams.com practice tests for helping me achieve a 91% score on the EC exam with just 12 days of preparation. Their guide was invaluable, and I wish them all the best for their future endeavors. |
User: Diana***** A few months after receiving a significant promotion with more responsibilities, I find myself often drawing from the knowledge I acquired from Killexams. It is also helpful, so I do not feel guilty anymore. |
User: Yelena***** After failing the PMI-PBA exam for the first time, I was about to give up, but I discovered killexams.com online. Although I could not initially afford it, I decided to take a chance, and I am glad I did. Their sample tests covered almost every question on the actual exam, and I passed with an impressive 98% score. I highly recommend their services. |
User: Yanina***** I recently passed the PMI-PBA exam with an excellent score, and while I cannot take full credit for it, I must thank Killexams.com for their invaluable support. Thanks to their exam simulator and relevant study material, I was able to confidently answer any question that came my way during the exam. I highly recommend Killexams to anyone preparing for the PMI-PBA exam. |
User: Ella***** After practicing with the killexams.com set for a few days, I passed the PMI-PBA exam. The questions and answers included in the package were correct, and I recognized many of them from the actual exam. Thanks to killexams.com, I was able to score higher than I had hoped for. |
Features of iPass4sure PMI-PBA Exam
- Files: PDF / Test Engine
- Premium Access
- Online Test Engine
- Instant download Access
- Comprehensive Q&A
- Success Rate
- Real Questions
- Updated Regularly
- Portable Files
- Unlimited Download
- 100% Secured
- Confidentiality: 100%
- Success Guarantee: 100%
- Any Hidden Cost: $0.00
- Auto Recharge: No
- Updates Intimation: by Email
- Technical Support: Free
- PDF Compatibility: Windows, Android, iOS, Linux
- Test Engine Compatibility: Mac / Windows / Android / iOS / Linux
Premium PDF with 200 Q&A
Get Full VersionAll PMI Exams
PMI ExamsCertification and Entry Test Exams
Complete exam list