Question: 237
You have set up a Flow to automatically assign a resource's manager to the approver field on Timecards. Users have
reported that submitted Timecards are going to the Project Manager for approval and not the resource's manager.
Of the following, which could be a reason for this?
A. PSA requires that only Project Managers can approve Timecards
B. The process builder to assign the resource's manager is not active
C. The configuration option Assign Project Manager To Time card Approver is set to True
Answer: A
Question: 238
Your company has both full time and part time resources. From a Human Resources perspective, part time resources
can work any number of hours per week. From a Resource Planning perspective, management has agreed that part time
workers can be estimated at 20 hours per week.
Based on this information, how many work calendars should be created?
A. One full time work calendar, and one work calendar for each unique part time contract
B. One full time work calendar, and one part time work calendar
C. One full time work calendar, one part time work calendar, and one generic flexible work calendar
Answer: C
Question: 239
Project Managers would like to display several fields prominently on the Project Lightning Page.
Which PSA Lightning Component could you use to meet this need?
A. FF Field Overview
B. FF Highlights
C. FF PSA Field Summary
Answer: B
Question: 240
You are notified that some approved Miscellaneous Adjustments records are not getting picked up in the Billing Event
Generation process during month end billing.
Which two of the following system settings do you need to have in place for Miscellaneous Adjustments to get picked
up in the billing run? (Choose two.)
A. The Effective Date value on the Miscellaneous Adjustments records is within the Date range of the Time period
used on the Billing Generation process.
B. The person running the Billing Event Generation process does not have Billing Miscellaneous Adjustments
permission control for the Region. Account, or Project selected on the Billing Generation process.
C. The Transaction Category value on the Miscellaneous Adjustments record exists in the Configuration option: Billing
Categories.
Answer: A,C
Question: 241
Which of the following custom settings can be specific to a User?
A. Search Resources Global
B. Timecard Entry Ul Personal
C. Assignment Settings
Answer: B
Question: 242
Your current setup of utilization automatically subtracts PSA Holidays from the total number of hours defined in a
resource's "Work Calendar."
How can utilization be configured so Holidays are not automatically subtracted?
A. Go to App Launcher > navigate to "PSA Administration" > select "Schedule Utilization" > Navigate to the
Information section > set "subtract holidays from total hours" to false
B. Go to Ag£ Launcher > navigate to "Configuration Groups" > select "Utilization" > select "subtract holidays from
total hours" > set to false
C. Go to Ag£ Launcher > navigate to "Utilization Calculation" > select the calculation you want modified > set
"subtract holidays from total hours" to false
Answer: C
Question: 243
Your company's leadership noticed that the "PSA Resourcing" Lightning Component is displaying a "Default Cost
Rate" column. They asked you to remove this column from the component. You edited the Resource Request
Lightning Page, selected the "PSA Resourcing" component, and identified the "Column Field Set" setting.
What is the next step to complete this change?
A. Go to Setup > navigate to the Object Manager for "Contact" > select Field Sets > remove the "Default Cost Rate"
field from the field set
B. Go to Setup > navigate to Custom Settings > open the "Resource Request" setting > populate the Field Set in the
"Resource Grid Field Set"
C. Go to Setup > navigate to the "PSA User" Permission Set > open the "Resource Request" object settings > remove
field level security for the "Default Cost Rate" field
Answer: A
Question: 244
An Administrator can find the majority of settings for PSA in which two of the following areas? (Choose two.)
A. Configuration Groups
B. Custom Settings
C. PSA Administration Page
Answer: A,C
Question: 245
You are in the process of setting up your organization's Resources and learn that Resources in France will be working
a 35-hour work week.
What will you need to do to set them up with the proper work calendar?
A. As PSA only allows one work calendar, it is best to implement a 40-hour work calendar and then create a
validation rule to only allow 35 hours a week.
B. As the Work Calendar mostly impacts Utilization, set them up with a 40-work calendar, and then include the 35-
hour hour work week in your utilization calculations.
C. Create a separate 35-hour work calendar and associate it to the French Resources, including any specific French
Holidays.
Answer: C
Question: 246
Your company is rolling out Skills and Certifications to encourage employees to track their skills and also decide
which skills they would like to acquire. After rolling this feature out, end-users have noted they can't add their
assignments to build their "Experience".
What could be causing this problem?
A. The "Enable Experience" checkbox in the enable-skills-experience configuration option is not selected
B. The "Enable Experience" checkbox in the Skills Management custom setting is not selected
C. The "Enable Experience" field on the PSA contact record is not selected
Answer: C
Question: 247
Currently Project Managers and Resource Managers are using Gantt. You do not want your Project Managers creating
assignment, resource requests or milestones from the Gantt.
Which of the following custom settings should you configure to hide these buttons?
A. Project Task Gantt Global Settings
B. Gantt Global Settings
C. Project Task Gantt Preferences
Answer: B
Question: 248
In your organization, you always send 2 separate invoices to your customers C one for Timecards & Expenses and the
other for Misc Adjustment type billable records.
How could this be done automatically using FinancialForce functionality?
A. You would set the "separateMiscellaneousAdiustments" Configuration Option to 'True", so that "Timecards &
Expenses" and "Misc Adjustments" are included in two separate Billing events.
B. In the first Billing cycle, the Billing team would deselect the "Include Misc Adjustment" checkbox, to exclude those
records from the Billing Event. In the second Billing cycle, they would be required to select "Include Misc
Adjustment" and deselect "Include Timecards and Expenses", resulting in two separate Billing Events.
C. You would set the "Include Misc Adjustments" settings in the "Billing" custom settings to "False", so those are
included in a separate Billing Event from Timecards & Expenses.
Answer: A
Question: 249
In your Company, a Resource Manager wants to provide the option for Resources to nominate themselves for
upcoming work they are interested in.
How can you set this up?
A. Enable "Self-Nominate for Resource Request" custom setting > add the "PSA Resource Self-Nomination"
Lightning component to the Resource Request Detail Page
B. Enable "Candidates Can Self-Nominate for Work" custom setting > add the "PSA Resource Self-Nomination"
Lightning component to the Lightning Home page
C. Enable "Self-Nominate for Work" custom setting > add the "PSA Self-Nomination" Lightning component to the
Project Detail Page
Answer: A
Question: 250
A Services manager has asked you to set up a unique "FF Navigation" lightning component on the "Services Delivery
Workspace" that will provide separate options to users based on which team (business unit) they belong to.
Which two of the following actions would successfully accomplish the required setup? (Choose two.)
A. The system admin can enable the "Hide Navigation Sections" setting within the "FF Navigation" lightning
component to support different teams
B. The system admin can clone the page and create two unique pages that have the "FF Navigation" lightning
component configured for their respective team
C. The system admin can add the "FF Navigation" component to the page twice and setup component visibility rules
to ensure the right team sees their navigation
Answer: A,B,C
Question: 251
Managers within your company are using the Resource Planner to check a resource's availability but report that they
are not seeing the Availability column on the Resource Planner.
Which two of the following could be causing this issue? (Choose two.)
A. Utilization Ermine checkbox is deselected under Utilization custom settinqs
B. Resource Availability column is not selected under the Resource Planner columns list
C. Managers don't have the field level access to Resource Availability
Answer: A,B
Question: 252
Your company hired its first part-time employee that needs to be set up as a Consultant in PSA. They will work about
20 hours a week instead of the normal 40 hours a week.
Which of the following steps should you take to ensure this consultant's utilization calculation will be calculated
correctly?
A. Create a new "Role" indicating the user is a Part Time Consultant
B. Create a new Part Time "Work Calendar" for 20 hours
C. Create a new "Utilization Calculation" labeled Part Time
Answer: B
Question: 253
On the Resource Request Lightning page, your team is requesting changes to the Filter panel on the right side of the
page, and would like to know what configurations are possible.
Which two of the following configurations are available for the Filter panel? (Choose two.)
A. Add or Remove the Start and End Date fields
B. Add or Remove Region. Practice, and Group filters
C. Add or Remove the Skills filters
Answer: A,B
Question: 254
The Finance Team is interested in limiting the amount for a particular type of expense company-wide.
Of the following, which is the best solution to accomplish this?
A. Set up an Expense Limit that will limit the expense based on the Expense Type on the Expense Limit record at the
global region level.
B. Set up an Expense Limit that will limit the expense based on the Expense Type on the RPG record.
C. Set up an Expense Limit that will limit the expense based on the Expense Type on the Resource Record.
Answer: A
Question: 255
To update Resource Roles in PSA, you will need to update the picklists of which two of the following objects?
(Choose two.)
A. Contact
B. Work Calendars
C. Assignment
Answer: A,C
Question: 256
The time periods in your org run through 2024. Your Finance team wants to start building forecast models through
2030.
What is the best way to help the Finance team accomplish their task?
A. Contact FinancialForce Onboarding and have them assist you jn uploadinq a "csvfile with the correct time periods
for the years 2025-2030 into your org
B. Use dataloader.io or Data Import Wizard to upload a "csvfile with the correct time periods for the years 2025-2030
into your org
C. Contact FinancialForce Support or your Partner to open a ticket, requestinq that Onboarding help load the required
time periods to ensure Actuals remain intact in your org
Answer: C

User: Luna*****

The brain dump specialists at killexams.com were always available via live chat to help with even the smallest problems. Their advice and clarifications were invaluable, and I passed my PSA-2023 certification exam on my first try using the killexams.com practice tests. The PSA-2023 exam simulator through killexams.com is also superb. I am grateful to have killexams.com PSA-2023 material, as it helped me achieve my goals.
User: Júlia*****

I fully trusted the practice tests from killexams.com for my psa-2023 exam coaching and passed the exam with ease. Their method of using the actual pool of exam questions used by the supplier helped me become familiar with almost all the questions in the exam. The reliability of their services is evident in their money-back guarantee.
User: Pushka*****

I recently passed the psa-2023 exam in just 30 minutes, and I found the questions to be quite similar to those provided by Killexams.com. Although there were a few differences, I was able to overcome them with the help of the preparation materials I invested in. The Killexams.com Questions and Answers and Exam Simulator proved to be a reliable source of exam preparation, and I highly recommend them to others. Overall, I am grateful for the assistance provided by Killexams.com.
User: Elaine*****

killexams.com has been a godsend to me, and I am now able to pursue higher-level jobs and select better organizations thanks to their exam materials. Though the psa-2023 exam and certification is specific to psa-2023, other employers will be interested in your certification, proving you to be a qualified candidate. The killexams.com psa-2023 exam guide covered all topics and areas, which made the exam less challenging. Though some questions were tricky, killexams.com helped me get most of them right.
User: Nur*****

I am proud to say that I have passed the PSA-2023 exam. All the questions on the exam were from Killexams.com. It was a real help for me on the PSA-2023 exam, and all my achievement goes to this guide. With the help of this test material, I was proficient enough to attempt all the questions in the PSA-2023 exam. The exam preparation material led me in the right direction and guaranteed 100% success in the exam.

Features of iPass4sure PSA-2023 Exam

  • Files: PDF / Test Engine
  • Premium Access
  • Online Test Engine
  • Instant download Access
  • Comprehensive Q&A
  • Success Rate
  • Real Questions
  • Updated Regularly
  • Portable Files
  • Unlimited Download
  • 100% Secured
  • Confidentiality: 100%
  • Success Guarantee: 100%
  • Any Hidden Cost: $0.00
  • Auto Recharge: No
  • Updates Intimation: by Email
  • Technical Support: Free
  • PDF Compatibility: Windows, Android, iOS, Linux
  • Test Engine Compatibility: Mac / Windows / Android / iOS / Linux

Premium PDF with 256 Q&A

Get Full Version

All Certinia Exams

Certinia Exams

Certification and Entry Test Exams

Complete exam list