QUESTION: 134
When are acceptance tests typically written for a user story?
1. After coding the story, but before user acceptance testing begins
2. After writing the story, but before coding begins
3. At the start of Product Backlog prioritization planning
4. After estimating the Product Backlog, but before Sprint planning begins
Answer: C
QUESTION: 135
Which of the seven principles of software development is best intended to solve the problem of inventories causing hidden errors in the process?
1. Fast-Flexible-Flow
2. Optimize the Whole
3. Deliver Early and Often
4. Eliminate Waste
Answer: D
QUESTION: 136
What do project reports show during the Sprint review meeting?
1. Estimates compared to the baseline
2. Actual results to the plan
3. Return on investment (ROI)
4. Earned value measurement (EVM)
Answer: C
QUESTION: 137
The purpose of "setting the stage'' in a project retrospective is to:
1. Restate the goal of the meeting and create an open atmosphere.
2. Review the scope statement and summarize project results.
3. Elevate the team's morale and ensure that everyone participates.
4. Describe the next Iteration and discuss lessons learned.
Answer: A
QUESTION: 138
A full cycle of design-code-verifyrelease practiced by extreme Programming (XP) teams is called:
1. Story
2. Timebox
3. Iteration
4. Burndown
Answer: C
QUESTION: 139
When facilitated and managed well, the primary benefits of a project retrospective should be to:
1. Increase empowerment and enjoyment for the team.
2. Identify the most important issues for the sponsors.
3. Provide an open forum for team member complaints.
4. Allow the team to get ahead on release planning.
Answer: D
QUESTION: 140
In a Lean project environment, visual controls:
1. Can be used by management for communicating specific corrective direction.
2. Are easy to use, reflect the team's progress, and show the team what to do next.
3. Are helpful while the team is forming but are less important for more experienced teams.
4. Should be kept to a minimum to avoid distracting the team from high-value activities.
Answer: A
QUESTION: 141
Which term best describes an Agile project's approach to risk analysis?
1. Regression
2. Pareto
3. Qualitative
4. Monte Carlo
Answer: D
QUESTION: 142
The primary purpose of a Sprint retrospective is for the team to:
1. Review stories planned for the next sprint and provide estimates,
2. Demonstrate completed user stories to the Product Owner.
3. Discuss what went well, what didn't, and ways to improve.
4. Individually provide status updates on user stories in progress.
Answer: C
QUESTION: 143
In a Lean Software Development environment, the Project Leader strives to eliminate:
1. Work in Process (WIP) and bugs.
2. Delays and building what is not needed.
3. Defects and features with low value stream values.
4. Poor requirements and changing scope.
Answer: C
QUESTION: 144
During iteration planning, the team is discussing the design for a user story. A team member states that a design document should be started since the system is complex in nature. Another team member responds that in Agile there is no documentation. How should the ScrumMaster respond?
1. Agree that documentation should be avoided, since it slows the progress of the team.
2. Explain that interactions are valued over documentation, but documentation is not forbidden.
3. Ask the manager if the technical processes mandate that designs be documented.
4. Ask the Product Owner if it is acceptable for the resources to spend time on documentation.
Answer: B
QUESTION: 145
For a "caves and commonroom arrangement, the most appropriate prerequisite is that the people in the room must be working on:
1. Whatever they choose.
2. Individual projects.
3. The same set of multiple projects,
4. The same project.
Answer: D
User: Oscar*****![]() ![]() ![]() ![]() ![]() With killexams.com’s pmi-200 exam guide, I scored 92% and grasped all critical concepts. The excellent exam engine and comprehensive resources were perfect for my needs as a college student. I am thankful to the killexams.com team for their outstanding support. |
User: Sarah*****![]() ![]() ![]() ![]() ![]() The killexams.com pmi-200 exam simulator and materials were exceptional, helping me earn my certification without surprises. The comprehensive package covered everything I needed, ensuring a smooth and successful exam experience. I highly recommend their resources. |
User: Zinaida*****![]() ![]() ![]() ![]() ![]() As the PMI-200 exam approached, going through Killexams.com Questions and Answers became a regular habit for me. With the exam looming just six days away, the study materials became even more crucial. Sometimes, I needed additional reference guides to better understand the topics, and Killexams.com provided just that. Thanks to their materials, I was able to score an impressive 980 in the exam, the highest in my class. |
User: Bill*****![]() ![]() ![]() ![]() ![]() Testprep materials were beyond expectations, helping me pass the pmi-200 exam with accurate and correct questions. Their exceptional resources have already been recommended to colleagues who also succeeded, and I am confident in endorsing their platform for anyone seeking reliable preparation for any certification exam. |
User: Olesya*****![]() ![]() ![]() ![]() ![]() Preparing for the pmi-200 exam was daunting, but killexams.com’s precise questions gave me the confidence to pass with 84%. Even with tricky questions, their answers guided me to the correct choices. |
Features of iPass4sure PMI-200 Exam
- Files: PDF / Test Engine
- Premium Access
- Online Test Engine
- Instant download Access
- Comprehensive Q&A
- Success Rate
- Real Questions
- Updated Regularly
- Portable Files
- Unlimited Download
- 100% Secured
- Confidentiality: 100%
- Success Guarantee: 100%
- Any Hidden Cost: $0.00
- Auto Recharge: No
- Updates Intimation: by Email
- Technical Support: Free
- PDF Compatibility: Windows, Android, iOS, Linux
- Test Engine Compatibility: Mac / Windows / Android / iOS / Linux
Premium PDF with 145 Q&A
Get Full VersionAll PMI Exams
PMI ExamsCertification and Entry Test Exams
Complete exam list