Atlassian ACP-620 Questions & Answers

Full Version: 635 Q&A


Latest ACP-620 Exam Questions and Practice Tests 2024 - Killexams.com

Latest ACP-620 Practice Tests with Actual Questions


Get Complete pool of questions with Premium PDF and Test Engine


Exam Code : ACP-620
Exam Name : Managing Jira Cloud Projects
Vendor Name :
"Atlassian"








ACP-620 Dumps ACP-620 Braindumps

ACP-620 Real Questions ACP-620 Practice Test ACP-620 Actual Questions


killexams.com


Atlassian


ACP-620


Managing Jira Cloud Projects


https://killexams.com/pass4sure/exam-detail/ACP-620



Question: 44


Nash’s team just completed their first sprint.


What can they learn from this chart? (Choose three.)



Some of the issues are resolved during non-working days. of the issues are still unresolved.

sprint ends with 0 story points. sprint starts with 20 story points.

are issues worth 5 story points resolved on July 13th. are no scope changes in this sprint.

(Assume Remaining Estimate and Time Spent is enabled for this board.)


A.

  1. Some

  2. This

  3. This

  4. There

  5. There




Answer: C,E,F
Explanation:

The grey area indicates non-working days. There were no issues resolved during non-working days since story points did not reduce in the grey area.


This chart starts drawing the Guideline and Remaining Values lines at the 18 story points on the y-axis.

On July 13th, story points were reduced from 15 to 10. This means that users have closed some issues that are worth 5 story points.


Users have closed all issues on July 20th. There are no story points remaining on this date.


Story points do not increase during this sprint. Since the Remaining Estimate and Time Spent is enabled for this board, scope change is indicated in the Burndown Chart for the subtask.



Question: 45


A group of developers are working on multiple Jira projects. They can view all Jira projects and have the ‘Move Issues’ permission in all Jira projects. However, they cannot move issues to some of the Jira projects.


the possible root cause of this problem?

do not have the ‘View Issue’ permission in some projects.

do not have the ‘Transition Issue’ permission in some projects. do not have the ‘Edit Issue’ permission in some projects.

do not have the ‘Create Issue’ permission in some projects.


r: D ation:

are moving issues from project to project, they need to make sure they have the Create Issues permissi project they want to move it to.


on: 46


cently joined the team as a scrum master.


ermission will allow Nash to perform the below actions? (Choose four.) ge version

ge component ge sprint

n issue’s due date minister Projects

What is

  1. They

  2. They

  3. They

  4. They


Answe


Explan


If users on in

the Jira


Questi Nash re Which p

  • Mana


  • Mana


  • Mana


  • Edit a

    1. Ad

    2. Manage Sprints

    3. Schedule Issues

    4. Edit Issues

    5. Manage Versions

    6. Manage Components




    Answer: A,B,C,D
    Explanation:

    Manage Versions and Manage Components do not exist in Jira project permissions.


    Administer Projects permission allow users to administer a project in Jira, which includes managing versions and components.


    Manage Sprints permission allow users to manage sprints. Users require Edit Issues and Schedule Issues permissions to edit the issues’ due date.



    Question: 47


    Which of the following are suitable scenarios to use Jira group? (Choose four.)

    1. Members of the group are responsible for making bulk changes on multiple issues.

      users will be working on multiple projects. mission can be managed at the global level.

      ite administrator will manage group membership.

      members require ‘Work On Issues’ permission to log work done.


      r: A,B,C,D


      ation:


      on Issues permission is not a global permission, but it is a project-level permission. Thus, it can be mana ject level by the project administrator and does not require a group.


      ite administrators have access to create groups and assign users to the group. ps can be associated with global and project permissions.

      ps can be used in multiple Jira projects.


      Project administrators can manage roles’ membership. ira administrators can create a new role.

      are associated with project permissions.

    2. The project administrator will manage group membership.

    3. Same

    4. Per

    5. The s

    6. Team


    Answe


    Explan


    Work ged at

    the pro


    Group:


  • Only s


  • Grou


  • Grou Role:


  • Only J


  • Roles


  • Each Jira project has default roles.


  • Users and groups can be assigned roles.



Question: 48

Nash is creating a new Scrum board with multiple Jira projects. Each project has a different status in its workflow. Which of the following are true? (Choose two.)

  1. Some issues will be hidden from the board.

  2. The user cannot create a new board with multiple Jira projects.

  3. All statuses will be mapped to 3 default columns: To Do, In Progress, and Done

  4. All issues will be hidden from thewwwboard.dumpspanda..com

  5. The status will be mapped to the first selected project when creating the new board.




Answer: C,D
Explanation:

If users are creating a new board (Kanban or Scrum) with multiple Jira projects, and each project has a unique workflow, all statuses will be mapped to 3 default columns: To Do, In Progress, and Done.


anban board, the issues will appear on the board as soon as users create the board.


crum board, all issues will not appear on the board because only issues in the active sprint will appear oard. After creating a new Scrum board, you do not have an active sprint.


on: 49


f the following are false about the roadmap? (Choose three.)

Users can choose which epics they want to display on the dashboard. Either Complete or Incomplete.

can change the view setting to customize their roadmap’s view. The changes will apply to all users tha o that project.

edule bars for child issues are currently available for scrum teams only. Users can customize epic’s color directly from the roadmap.

can change the epic bar timeline to weeks, months, quarters, or yearly.


r: A,B,E


ation:


ettings is a collection of settings that allow users to adjust their personal view of the roadmap. The setti individual users. Users can change their view at any time.


le Bars for child issues are currently available for scrum teams only.


isplay Options allow users to use the dropdown to select which epics to display. The current options are lete, or Complete.

On the K


On the S on the

Scrum b


Questi


Which o A.

  1. Users t have

    access t

  2. Sch D.

E. Users


Answe


Explan


View S ngs only

apply to


Schedu


Epic D All,

Incomp

Users can adjust the color of an epic directly on the roadmap. Simply right-click the epic and choose a fresh color. The epic bar has a default duration according to how users view their timeline. The default durations are weeks,

months, or quarters.



Question: 50


Which of the following can be explained from the chart below?



Users have not started the sprint yet. deleted the sprint.

closed some issues the moment the sprint started. There are no issues in the sprint.


r: C ation:

rey ‘guideline’ line does not show, the sprint may have been started before any issues were assigned to


ase, since the grey ‘guideline’ line does show up in the chart, the sprint already started. The ‘remaining icates that someone closed some issues that are worth 5 story points as soon as they started their sprint.

A.

  1. Users

  2. Users D.


Answe


Explan


If the g it.


In this c values’

line ind


User: Alfred*****

Even though I had a full-time job and family responsibilities, I decided to take the ACP-620 exam. I needed a quick and easy strategy for studying, and I found it in Killexams.com Questions and Answers. The concise answers were easy to remember, and I am thankful for the guidance.
User: Madelina*****

I want to share my experience with killexams.com, which helped me perform exceptionally well in my acp-620 exam, surpassing all expectations. In my opinion, killexams.com is one of the most outstanding online coaching ventures that deserves recognition.
User: Mila*****

When my ACP-620 exam was only 10 days away, I was struggling with the topics and was afraid that I would not be able to pass. However, I found the practice tests package from Killexams.com, and it contained specific answers presented in a simple manner, which was exactly what I needed. Thanks to Killexams.com, I was able to pass the exam with a score of 78%.
User: Zenovia*****

I did not want to burden my father for help during my acp-620 exam preparation, as seeking his assistance would have been like courting trouble.
User: Sasha*****

I recently passed my ACP-620 exam, thanks to the excellent questions and answers provided by Killexams.com. I used their practice tests to prepare for the exam, and I am amazed at how well they worked. Not only did I pass with a high score, but I also learned valuable information that will help me in my career. Killexams.com is more than just a practice test; Its an invaluable resource for anyone looking to pass the ACP-620 exam.

Features of iPass4sure ACP-620 Exam

  • Files: PDF / Test Engine
  • Premium Access
  • Online Test Engine
  • Instant download Access
  • Comprehensive Q&A
  • Success Rate
  • Real Questions
  • Updated Regularly
  • Portable Files
  • Unlimited Download
  • 100% Secured
  • Confidentiality: 100%
  • Success Guarantee: 100%
  • Any Hidden Cost: $0.00
  • Auto Recharge: No
  • Updates Intimation: by Email
  • Technical Support: Free
  • PDF Compatibility: Windows, Android, iOS, Linux
  • Test Engine Compatibility: Mac / Windows / Android / iOS / Linux

Premium PDF with 635 Q&A

Get Full Version

All Atlassian Exams

Atlassian Exams

Certification and Entry Test Exams

Complete exam list