Atlassian ACP-620 Questions & Answers

Full Version: 635 Q&A


Latest ACP-620 Exam Questions and Practice Tests 2025 - Killexams.com


ACP-620 Dumps ACP-620 Braindumps

ACP-620 Real Questions ACP-620 Practice Test ACP-620 Actual Questions


killexams.com


Atlassian


ACP-620


Managing Jira Cloud Projects


https://killexams.com/pass4sure/exam-detail/ACP-620


Question: 44


Nash’s team just completed their first sprint.


What can they learn from this chart? (Choose three.)



Some of the issues are resolved during non-working days. of the issues are still unresolved.

sprint ends with 0 story points. sprint starts with 20 story points.

are issues worth 5 story points resolved on July 13th. are no scope changes in this sprint.

(Assume Remaining Estimate and Time Spent is enabled for this board.)


A.

  1. Some

  2. This

  3. This

  4. There

  5. There


Answer: C,E,F Explanation:

The grey area indicates non-working days. There were no issues resolved during non-working days since story points did not reduce in the grey area.


This chart starts drawing the Guideline and Remaining Values lines at the 18 story points on the y-axis.

On July 13th, story points were reduced from 15 to 10. This means that users have closed some issues that are worth 5 story points.


Users have closed all issues on July 20th. There are no story points remaining on this date.


Story points do not increase during this sprint. Since the Remaining Estimate and Time Spent is enabled for this board, scope change is indicated in the Burndown Chart for the subtask.


Question: 45


A group of developers are working on multiple Jira projects. They can view all Jira projects and have the ‘Move Issues’ permission in all Jira projects. However, they cannot move issues to some of the Jira projects.


the possible root cause of this problem?

do not have the ‘View Issue’ permission in some projects.

do not have the ‘Transition Issue’ permission in some projects. do not have the ‘Edit Issue’ permission in some projects.

do not have the ‘Create Issue’ permission in some projects.


r: D ation:

are moving issues from project to project, they need to make sure they have the Create Issues permissi project they want to move it to.


on: 46


cently joined the team as a scrum master.


ermission will allow Nash to perform the below actions? (Choose four.) ge version

ge component ge sprint

n issue’s due date minister Projects

What is

  1. They

  2. They

  3. They

  4. They


Answe


Explan


If users on in

the Jira


Questi Nash re Which p


Question: 48

Nash is creating a new Scrum board with multiple Jira projects. Each project has a different status in its workflow. Which of the following are true? (Choose two.)

  1. Some issues will be hidden from the board.

  2. The user cannot create a new board with multiple Jira projects.

  3. All statuses will be mapped to 3 default columns: To Do, In Progress, and Done

  4. All issues will be hidden from thewwwboard.dumpspanda..com

  5. The status will be mapped to the first selected project when creating the new board.


Answer: C,D Explanation:

If users are creating a new board (Kanban or Scrum) with multiple Jira projects, and each project has a unique workflow, all statuses will be mapped to 3 default columns: To Do, In Progress, and Done.


anban board, the issues will appear on the board as soon as users create the board.


crum board, all issues will not appear on the board because only issues in the active sprint will appear oard. After creating a new Scrum board, you do not have an active sprint.


on: 49


f the following are false about the roadmap? (Choose three.)

Users can choose which epics they want to display on the dashboard. Either Complete or Incomplete.

can change the view setting to customize their roadmap’s view. The changes will apply to all users tha o that project.

edule bars for child issues are currently available for scrum teams only. Users can customize epic’s color directly from the roadmap.

can change the epic bar timeline to weeks, months, quarters, or yearly.


r: A,B,E


ation:


ettings is a collection of settings that allow users to adjust their personal view of the roadmap. The setti individual users. Users can change their view at any time.


le Bars for child issues are currently available for scrum teams only.


isplay Options allow users to use the dropdown to select which epics to display. The current options are lete, or Complete.

On the K


On the S on the

Scrum b


Questi


Which o A.

  1. Users t have

    access t

  2. Sch D.

E. Users


Answe


Explan


View S ngs only

apply to


Schedu


Epic D All,

Incomp

Users can adjust the color of an epic directly on the roadmap. Simply right-click the epic and choose a fresh color. The epic bar has a default duration according to how users view their timeline. The default durations are weeks,

months, or quarters.


Question: 50


Which of the following can be explained from the chart below?



Users have not started the sprint yet. deleted the sprint.

closed some issues the moment the sprint started. There are no issues in the sprint.


r: C ation:

rey ‘guideline’ line does not show, the sprint may have been started before any issues were assigned to


ase, since the grey ‘guideline’ line does show up in the chart, the sprint already started. The ‘remaining icates that someone closed some issues that are worth 5 story points as soon as they started their sprint.

A.

  1. Users

  2. Users D.


Answe


Explan


If the g it.


In this c values’

line ind


How can you filter for issues that are in both the "Development" and "Testing" sprints?


  1. Sprint in ("Development", "Testing")

    print in openSprints() AND Sprint in ("Development", "Testing") print in ("Development" AND "Testing")


    wer: A


    anation: The Sprint in ("Development", "Testing") syntax correctly fil ssues that are in either of the specified sprints, leveraging the IN opera


    stion: 618

    does a Notification Scheme in Jira Cloud control?


    he types of issues that can be created he visibility of issues to users

    he alerts sent to users about issue changes he workflow transitions available for issues

    Sprint = "Development" AND Sprint = "Testing"

  2. S

  3. S


Ans


Expl ters

for i tor.


Que

What


  1. T

  2. T

  3. T

  4. T


Answer: C


Explanation: A Notification Scheme controls the alerts sent to users based on changes to issues, ensuring relevant stakeholders are informed of important updates.

Question: 619

Which feature allows users to see dependencies between sub-tasks and parent issues?


  1. Issue Links

  2. Epic Links

    omments wer: A

    anation: Issue Links enable users to visualize and manage dependenci een sub-tasks and their parent issues, enhancing project management egies.


    stion: 620

    ch of the following can be customized in a Jira project to improve user rience?


    sue types orkflows creens

    ll of the above

    Labels

  3. C


Ans


Expl es

betw strat


Que Whi expe


  1. Is

  2. W

  3. S

  4. A


Answer: D


Explanation: All the listed options—issue types, workflows, and screensâ

€”can be customized in a Jira project to improve user experience and tailor the project to specific needs.


For a project manager wanting to visualize issue resolution trends by assignee, which report should they utilize?


esolution Time Report ontrol Chart

verage Age Report elocity Chart

reated vs. Resolved Issues Report wer: C

anation: The Control Chart can be filtered by assignee, allowing proje agers to analyze resolution trends and performance for each team mem


stion: 622


is the primary advantage of using a Kanban approach in project agement? (Choose one.)

  • User Workload Report

  • R

  • C

  • A

  • V

  • C


  • Ans


    Expl ct

    man ber.


    Que


    What man


    1. It eliminates the need for user stories.

    2. It allows for continuous delivery without fixed iterations.

    3. It requires extensive documentation.

    4. It enforces strict timelines for task completion. Answer: B

    Explanation: The Kanban approach supports continuous delivery, allowing teams to focus on flow and adapt quickly to changing priorities without being tied to fixed iterations.


    Question: 623


    ch of the following queries will find issues that are linked to a specific

    ?


    sue in linkedIssues("ISSUE-123") nkedIssues("ISSUE-123")

    sue = "ISSUE-123" sue in ("ISSUE-123") nk = "ISSUE-123"

    latedIssues("ISSUE-123") wer: A

    anation: The query issue in linkedIssues("ISSUE-123") correctly retri sues that are linked to the specified issue.


    stion: 624

    Whi issue


    1. is

    2. li

    3. is

    4. is

    5. li

    6. re Ans

    Expl eves

    all is


    Que

    Which Jira feature allows for dynamic evaluation of user access to issues?


    1. Issue Security Levels

    2. Custom Fields

    3. Permission Schemes

    4. Automation Rules

    Answer: A


    Explanation: Issue Security Levels dynamically evaluate user access based on the defined security levels, ensuring that permissions are enforced consistently according to the user’s role or group membership.


    stion: 625

    ch automation rule would you use to notify a user when their assigned e in two days?


    cheduled trigger with a JQL condition sue updated trigger

    sue created trigger tatus changed trigger


    wer: A


    anation: A "Scheduled trigger" combined with a JQL condition can be run daily, checking for issues that are due in two days. This ensures tim

    ications for upcoming deadlines.

    Que

    Whi issue

    is du


    1. S

    2. Is

    3. Is

    4. S


    Ans


    Expl set

    to ely

    notif


    Question: 626

    Tom wants to ensure that the issues on his board can be filtered based on custom fields. What is the most effective way to implement this in Jira?


    1. Use JQL queries in the board filter.

    2. Create a quick filter for each custom field.

    3. Adjust the workflow to include custom fields.

    4. Use the issue navigator to filter results. Answer: A

    Explanation:

    tly impact board filtering, and the issue navigator (D) is separate fro context.


    stion: 627

    happens when an issue is assigned to a security level that the user do elong to?


    he issue is automatically reassigned.

    he user can see the issue but cannot edit it. he issue is invisible to the user.

    he user receives a notification. wer: C

    anation: When an issue is assigned to a security level that a user does ng to, the issue becomes invisible to that user, preventing any access o

    Using JQL queries in the board filter (A) allows for effective filtering based on custom fields. Quick filters (B) are useful for temporary filtering but do not affect the underlying board configuration. Adjusting the workflow (C) does not direc m the

    board


    Que

    What es

    not b


    1. T

    2. T

    3. T

    4. T


    Ans


    Expl not

    belo r

    interaction with the issue.


    Question: 628


    To measure the frequency of issues created by different project components,

    which report is most suitable?


    1. Issue Statistics Report

    2. Created vs. Resolved Issues Report

    3. User Workload Report

    4. Time Tracking Report

    5. Velocity Chart


      wer: A


      anation: The Issue Statistics Report can be configured to show the nu sues created by different components, providing insights into compon load.


      stion: 629

      is it important to regularly update the data in a Control Chart?


      keep the report visually appealing

      ensure decisions are based on the most current information compare with other teams

      minimize the number of data points


      wer: B

      Cumulative Flow Diagram Ans

    Expl mber

    of is ent

    work


    Que

    Why


    1. To

    2. To

    3. To

    4. To


    Ans


    Explanation: Regularly updating the data in a Control Chart is crucial to ensure that decisions are based on the most current information, allowing teams to respond effectively to changes in performance.

    Question: 630

    What is the correct method to enable issue types in a specific project?


    1. Modify jira-config.xml

    2. Use the project settings interface

    3. Edit the workflow directly

    4. Change the global settings

      se the REST API wer: B

      anation: To enable issue types for a specific project, you should use th ct settings interface, where you can select which issue types are avail hat project.


      stion: 631

      ch type of automation rule would you use to send a notification when fic label is added to an issue?


      cheduled Rule

      sue Transition Rule sue Updated Rule

      ncoming Webhook Rule

      Update the context.xml file

    5. U


    Ans


    Expl e

    proje able

    for t


    Que

    Whi a

    speci


    1. S

    2. Is

    3. Is

    4. I


    Answer: C


    Explanation: The "Issue Updated" trigger allows for monitoring changes to issue fields, including the addition of labels, and can be used to send notifications.

    Question: 632

    Which of the following JQL queries would return all sub-tasks that are currently "In Progress"?


    1. type = Sub-task AND status = "In Progress"

      sue in subtaskOf("In Progress")

      arent in openSprints() AND type = Sub-task wer: A

      anation: The correct JQL query directly filters for sub-tasks with the s rogress," accurately retrieving all relevant issues.


      stion: 633


      ch report would provide insight into the number of issues transitioned een statuses during a sprint?


      sue Statistics Report print Report

      ontrol Chart

      status = "In Progress" AND type in (Sub-task)

    2. is

    3. p Ans

    Expl tatus

    "In P


    Que


    Whi betw


    1. Is

    2. S

    3. C

    4. Burndown Chart

    5. Cumulative Flow Diagram

    6. Velocity Chart Answer: C

    Explanation: The Control Chart shows the number of issues transitioned

    through statuses over time, giving insights into flow and team efficiency during the sprint.


    Question: 634

    ement?


    ustom fields for priority pics for categorizing tasks abels for tagging issues

    omponents for grouping tasks atuses to indicate urgency


    wer: A


    anation: Implementing custom fields for priority allows the project ager to categorize issues based on their urgency effectively. This setup ioritizing work and managing workflows.


    stion: 635

    ch permission is required to edit a project's configuration in Jira?

    A project manager wants to ensure that all issues in a Jira project are categorized according to their urgency. Which configuration should they impl


    1. C

    2. E

    3. L

    4. C

    5. St

    Ans Expl

    man aids

    in pr


    Que

    Whi


    1. Browse Projects

    2. Edit Issues

    3. Manage Sprints

    4. Manage Project Configuration Answer: D

    Explanation: The "Manage Project Configuration" permission is necessary to make changes to a project's settings and configuration.


    User: Thomas*****

    I was two weeks away from my ACP-620 exam, but unfortunately, my ACP-620 books were destroyed in a fire at my place. I thought about giving up on taking the exam since I had no resources to prepare from. Then I discovered Killexams.com, and I am still shocked that I passed my ACP-620 exam. The free demo of Killexams.com helped me understand the concepts easily.
    User: Nickolai*****

    My browsing on the internet brought me to killexams.com right before my ACP-620 exam, and it turned out to be the best thing that happened to me. It helped me pass the exam and perform exceptionally well.
    User: Nastassi*****

    I recently purchased the ACP-620 brain dump test and was pleased to see that Killexams.com had provided the latest updates, including new regions. Their turnaround time and support were exceptional, and I found the exam materials to be very useful and informative.
    User: Lukah*****

    When my acp-620 exam was less than a week away, my preparation became a stressful situation, and I worried that I would have to retake the exam to get the 80% passing score. Following a friend recommendation, I purchased the questions and answers from killexams.com and was able to make adequate preparations with their well-crafted material. As a result, I was able to achieve a score of 90%, which was more than I had hoped for.
    User: Ulyana*****

    I am thrilled to announce that I have passed the acp-620 exam with excellent scores, thanks to killexams.com. Their test questions were the same as the ones I encountered on the actual exam, and their practice tests were extremely helpful in my preparation. I can now pursue my dream career, all thanks to the team at killexams.com.

    Features of iPass4sure ACP-620 Exam

    • Files: PDF / Test Engine
    • Premium Access
    • Online Test Engine
    • Instant download Access
    • Comprehensive Q&A
    • Success Rate
    • Real Questions
    • Updated Regularly
    • Portable Files
    • Unlimited Download
    • 100% Secured
    • Confidentiality: 100%
    • Success Guarantee: 100%
    • Any Hidden Cost: $0.00
    • Auto Recharge: No
    • Updates Intimation: by Email
    • Technical Support: Free
    • PDF Compatibility: Windows, Android, iOS, Linux
    • Test Engine Compatibility: Mac / Windows / Android / iOS / Linux

    All Atlassian Exams

    Atlassian Exams

    Certification and Entry Test Exams

    Complete exam list