Question: 44
Nash’s team just completed their first sprint.
What can they learn from this chart? (Choose three.)
Some of the issues are resolved during non-working days. of the issues are still unresolved.
sprint ends with 0 story points. sprint starts with 20 story points.
are issues worth 5 story points resolved on July 13th. are no scope changes in this sprint.
(Assume Remaining Estimate and Time Spent is enabled for this board.)
A.
1. Some
2. This
3. This
4. There
5. There
Answer: C,E,F Explanation:
The grey area indicates non-working days. There were no issues resolved during non-working days since story points did not reduce in the grey area.
This chart starts drawing the Guideline and Remaining Values lines at the 18 story points on the y-axis.
On July 13th, story points were reduced from 15 to 10. This means that users have closed some issues that are worth 5 story points.
Users have closed all issues on July 20th. There are no story points remaining on this date.
Story points do not increase during this sprint. Since the Remaining Estimate and Time Spent is enabled for this board, scope change is indicated in the Burndown Chart for the subtask.
Question: 45
A group of developers are working on multiple Jira projects. They can view all Jira projects and have the ‘Move Issues’ permission in all Jira projects. However, they cannot move issues to some of the Jira projects.
the possible root cause of this problem?
do not have the ‘View Issue’ permission in some projects.
do not have the ‘Transition Issue’ permission in some projects. do not have the ‘Edit Issue’ permission in some projects.
do not have the ‘Create Issue’ permission in some projects.
r: D ation:
are moving issues from project to project, they need to make sure they have the Create Issues permissi project they want to move it to.
on: 46
cently joined the team as a scrum master.
ermission will allow Nash to perform the below actions? (Choose four.) ge version
ge component ge sprint
n issue’s due date minister Projects
What is
1. They
2. They
3. They
4. They
Answe
Explan
If users on in
the Jira
Questi Nash re Which p
* Mana
* Mana
* Mana
* Edit a
1. Ad
2. Manage Sprints
3. Schedule Issues
4. Edit Issues
5. Manage Versions
6. Manage Components
Answer: A,B,C,D Explanation:
Manage Versions and Manage Components do not exist in Jira project permissions.
Administer Projects permission allow users to administer a project in Jira, which includes managing versions and components.
Manage Sprints permission allow users to manage sprints. Users require Edit Issues and Schedule Issues permissions to edit the issues’ due date.
Question: 47
Which of the following are suitable scenarios to use Jira group? (Choose four.)
1. Members of the group are responsible for making bulk changes on multiple issues.
users will be working on multiple projects. mission can be managed at the global level.
ite administrator will manage group membership.
members require ‘Work On Issues’ permission to log work done.
r: A,B,C,D
ation:
on Issues permission is not a global permission, but it is a project-level permission. Thus, it can be mana ject level by the project administrator and does not require a group.
ite administrators have access to create groups and assign users to the group. ps can be associated with global and project permissions.
ps can be used in multiple Jira projects.
Project administrators can manage roles’ membership. ira administrators can create a new role.
are associated with project permissions.
The project administrator will manage group membership.
2. Same
3. Per
4. The s
5. Team
Answe
Explan
Work ged at
the pro
Group:
* Only s
* Grou
* Grou Role:
–
* Only J
* Roles
* Each Jira project has default roles.
* Users and groups can be assigned roles.
Question: 48
Nash is creating a new Scrum board with multiple Jira projects. Each project has a different status in its workflow. Which of the following are true? (Choose two.)
1. Some issues will be hidden from the board.
2. The user cannot create a new board with multiple Jira projects.
3. All statuses will be mapped to 3 default columns: To Do, In Progress, and Done
4. All issues will be hidden from thewwwboard.dumpspanda..com
5. The status will be mapped to the first selected project when creating the new board.
Answer: C,D Explanation:
If users are creating a new board (Kanban or Scrum) with multiple Jira projects, and each project has a unique workflow, all statuses will be mapped to 3 default columns: To Do, In Progress, and Done.
anban board, the issues will appear on the board as soon as users create the board.
crum board, all issues will not appear on the board because only issues in the active sprint will appear oard. After creating a new Scrum board, you do not have an active sprint.
on: 49
f the following are false about the roadmap? (Choose three.)
Users can choose which epics they want to display on the dashboard. Either Complete or Incomplete.
can change the view setting to customize their roadmap’s view. The changes will apply to all users tha o that project.
edule bars for child issues are currently available for scrum teams only. Users can customize epic’s color directly from the roadmap.
can change the epic bar timeline to weeks, months, quarters, or yearly.
r: A,B,E
ation:
ettings is a collection of settings that allow users to adjust their personal view of the roadmap. The setti individual users. Users can change their view at any time.
le Bars for child issues are currently available for scrum teams only.
isplay Options allow users to use the dropdown to select which epics to display. The current options are lete, or Complete.
On the K
On the S on the
Scrum b
Questi
Which o A.
1. Users t have
access t
2. Sch D.
E. Users
Answe
Explan
View S ngs only
apply to
Schedu
Epic D All,
Incomp
Users can adjust the color of an epic directly on the roadmap. Simply right-click the epic and choose a fresh color. The epic bar has a default duration according to how users view their timeline. The default durations are weeks,
months, or quarters.
Question: 50
Which of the following can be explained from the chart below?
Users have not started the sprint yet. deleted the sprint.
closed some issues the moment the sprint started. There are no issues in the sprint.
r: C ation:
rey ‘guideline’ line does not show, the sprint may have been started before any issues were assigned to
ase, since the grey ‘guideline’ line does show up in the chart, the sprint already started. The ‘remaining icates that someone closed some issues that are worth 5 story points as soon as they started their sprint.
A.
1. Users
2. Users D.
Answe
Explan
If the g it.
In this c values’
line ind
How can you filter for issues that are in both the "Development" and "Testing" sprints?
1. Sprint in ("Development", "Testing")
print in openSprints() AND Sprint in ("Development", "Testing") print in ("Development" AND "Testing")
wer: A
anation: The Sprint in ("Development", "Testing") syntax correctly fil ssues that are in either of the specified sprints, leveraging the IN opera
stion: 618
does a Notification Scheme in Jira Cloud control?
he types of issues that can be created he visibility of issues to users
he alerts sent to users about issue changes he workflow transitions available for issues
Sprint = "Development" AND Sprint = "Testing"
2. S
3. S
Ans
Expl ters
for i tor.
Que
What
1. T
2. T
3. T
4. T
Answer: C
Explanation: A Notification Scheme controls the alerts sent to users based on changes to issues, ensuring relevant stakeholders are informed of important updates.
Question: 619
Which feature allows users to see dependencies between sub-tasks and parent issues?
1. Issue Links
2. Epic Links
omments wer: A
anation: Issue Links enable users to visualize and manage dependenci een sub-tasks and their parent issues, enhancing project management egies.
stion: 620
ch of the following can be customized in a Jira project to improve user rience?
sue types orkflows creens
ll of the above
Labels
3. C
Ans
Expl es
betw strat
Que Whi expe
1. Is
2. W
3. S
4. A
Answer: D
Explanation: All the listed options—issue types, workflows, and screensâ
€”can be customized in a Jira project to improve user experience and tailor the project to specific needs.
For a project manager wanting to visualize issue resolution trends by assignee, which report should they utilize?
esolution Time Report ontrol Chart
verage Age Report elocity Chart
reated vs. Resolved Issues Report wer: C
anation: The Control Chart can be filtered by assignee, allowing proje agers to analyze resolution trends and performance for each team mem
stion: 622
is the primary advantage of using a Kanban approach in project agement? (Choose one.)
User Workload Report
R
C
A
V
C
Ans
Expl ct
man ber.
Que
What man
1. It eliminates the need for user stories.
2. It allows for continuous delivery without fixed iterations.
3. It requires extensive documentation.
4. It enforces strict timelines for task completion. Answer: B
Explanation: The Kanban approach supports continuous delivery, allowing teams to focus on flow and adapt quickly to changing priorities without being tied to fixed iterations.
Question: 623
ch of the following queries will find issues that are linked to a specific
?
sue in linkedIssues("ISSUE-123") nkedIssues("ISSUE-123")
sue = "ISSUE-123" sue in ("ISSUE-123") nk = "ISSUE-123"
latedIssues("ISSUE-123") wer: A
anation: The query issue in linkedIssues("ISSUE-123") correctly retri sues that are linked to the specified issue.
stion: 624
Whi issue
1. is
2. li
3. is
4. is
5. li
6. re Ans
Expl eves
all is
Que
Which Jira feature allows for dynamic evaluation of user access to issues?
1. Issue Security Levels
2. Custom Fields
3. Permission Schemes
4. Automation Rules
Answer: A
Explanation: Issue Security Levels dynamically evaluate user access based on the defined security levels, ensuring that permissions are enforced consistently according to the user’s role or group membership.
stion: 625
ch automation rule would you use to notify a user when their assigned e in two days?
cheduled trigger with a JQL condition sue updated trigger
sue created trigger tatus changed trigger
wer: A
anation: A "Scheduled trigger" combined with a JQL condition can be run daily, checking for issues that are due in two days. This ensures tim
ications for upcoming deadlines.
Que
Whi issue
is du
1. S
2. Is
3. Is
4. S
Ans
Expl set
to ely
notif
Question: 626
Tom wants to ensure that the issues on his board can be filtered based on custom fields. What is the most effective way to implement this in Jira?
1. Use JQL queries in the board filter.
2. Create a quick filter for each custom field.
3. Adjust the workflow to include custom fields.
4. Use the issue navigator to filter results. Answer: A
Explanation:
tly impact board filtering, and the issue navigator (D) is separate fro context.
stion: 627
happens when an issue is assigned to a security level that the user do elong to?
he issue is automatically reassigned.
he user can see the issue but cannot edit it. he issue is invisible to the user.
he user receives a notification. wer: C
anation: When an issue is assigned to a security level that a user does ng to, the issue becomes invisible to that user, preventing any access o
Using JQL queries in the board filter (A) allows for effective filtering based on custom fields. Quick filters (B) are useful for temporary filtering but do not affect the underlying board configuration. Adjusting the workflow (C) does not direc m the
board
Que
What es
not b
1. T
2. T
3. T
4. T
Ans
Expl not
belo r
interaction with the issue.
Question: 628
To measure the frequency of issues created by different project components,
which report is most suitable?
1. Issue Statistics Report
2. Created vs. Resolved Issues Report
3. User Workload Report
4. Time Tracking Report
5. Velocity Chart
wer: A
anation: The Issue Statistics Report can be configured to show the nu sues created by different components, providing insights into compon load.
stion: 629
is it important to regularly update the data in a Control Chart?
keep the report visually appealing
ensure decisions are based on the most current information compare with other teams
minimize the number of data points
wer: B
Cumulative Flow Diagram Ans
Expl mber
of is ent
work
Que
Why
1. To
2. To
3. To
4. To
Ans
Explanation: Regularly updating the data in a Control Chart is crucial to ensure that decisions are based on the most current information, allowing teams to respond effectively to changes in performance.
Question: 630
What is the correct method to enable issue types in a specific project?
1. Modify jira-config.xml
2. Use the project settings interface
3. Edit the workflow directly
4. Change the global settings
se the REST API wer: B
anation: To enable issue types for a specific project, you should use th ct settings interface, where you can select which issue types are avail hat project.
stion: 631
ch type of automation rule would you use to send a notification when fic label is added to an issue?
cheduled Rule
sue Transition Rule sue Updated Rule
ncoming Webhook Rule
Update the context.xml file
5. U
Ans
Expl e
proje able
for t
Que
Whi a
speci
1. S
2. Is
3. Is
4. I
Answer: C
Explanation: The "Issue Updated" trigger allows for monitoring changes to issue fields, including the addition of labels, and can be used to send notifications.
Question: 632
Which of the following JQL queries would return all sub-tasks that are currently "In Progress"?
1. type = Sub-task AND status = "In Progress"
sue in subtaskOf("In Progress")
arent in openSprints() AND type = Sub-task wer: A
anation: The correct JQL query directly filters for sub-tasks with the s rogress," accurately retrieving all relevant issues.
stion: 633
ch report would provide insight into the number of issues transitioned een statuses during a sprint?
sue Statistics Report print Report
ontrol Chart
status = "In Progress" AND type in (Sub-task)
2. is
3. p Ans
Expl tatus
"In P
Que
Whi betw
1. Is
2. S
3. C
4. Burndown Chart
5. Cumulative Flow Diagram
6. Velocity Chart Answer: C
Explanation: The Control Chart shows the number of issues transitioned
through statuses over time, giving insights into flow and team efficiency during the sprint.
Question: 634
ement?
ustom fields for priority pics for categorizing tasks abels for tagging issues
omponents for grouping tasks atuses to indicate urgency
wer: A
anation: Implementing custom fields for priority allows the project ager to categorize issues based on their urgency effectively. This setup ioritizing work and managing workflows.
stion: 635
ch permission is required to edit a project's configuration in Jira?
A project manager wants to ensure that all issues in a Jira project are categorized according to their urgency. Which configuration should they impl
1. C
2. E
3. L
4. C
5. St
Ans Expl
man aids
in pr
Que
Whi
1. Browse Projects
2. Edit Issues
3. Manage Sprints
4. Manage Project Configuration Answer: D
Explanation: The "Manage Project Configuration" permission is necessary to make changes to a project's settings and configuration.
User: Muhammad*****![]() ![]() ![]() ![]() ![]() Your question bank is a valuable resource. I scored 89.1% in the acp-620 exam, thanks to your professionals. Your exam practice tests were extremely useful, clear, concise, and covered the entire material with a superb bank of questions that helped me prepare well. Thanks again to you and your team. |
User: Effie*****![]() ![]() ![]() ![]() ![]() I am extremely satisfied with the result of my ATLASSIAN CERTIFIED JIRA ADMINISTRATOR FOR DATA CENTER AND SERVER 2025 exam. After only 10 days of preparation using Killexams.com package, I was able to score 97%. The exam simulator provided by Killexams.com was particularly helpful because it gave me a chance to practice with the look and feel of a real exam. The package is not only a brain practice test but also a true study guide, which is hard to find for modern exams. |
User: Yuliana*****![]() ![]() ![]() ![]() ![]() Passing the acp-620 exam was made easy with the brief and easy language used in the materials, without the need to memorize. With killexams.com brain dump practice tests as my guide, I was able to finish my training in just three weeks and passed the exam with 88% marks. The smooth guide was exactly what I needed as complex language made me sleepy, and the long content of the books was a hassle. Thank you, killexams.com, for making my day. |
User: Rodina*****![]() ![]() ![]() ![]() ![]() After spending sufficient time studying the materials provided by Killexams, I passed the acp-620 exam with flying colors. Despite some questions being slightly different, the topics and overall approach were accurate. I cannot understand why some people complain about the quality of the acp-620 questions. If you study hard enough, you will succeed. |
User: Norvina*****![]() ![]() ![]() ![]() ![]() I found the Atlassian acp-620 exam to be quite lengthy to prepare for due to my busy schedule with office assignments. However, killexams.com provided me with question and answer resources that motivated me to take on the test. It was truly supportive and helped me pass all my doubts on the Atlassian acp-620 topic. I felt very happy to pass the exam with a 97% mark, and all credit goes to killexams.com for this terrific help. |
Features of iPass4sure ACP-620 Exam
- Files: PDF / Test Engine
- Premium Access
- Online Test Engine
- Instant download Access
- Comprehensive Q&A
- Success Rate
- Real Questions
- Updated Regularly
- Portable Files
- Unlimited Download
- 100% Secured
- Confidentiality: 100%
- Success Guarantee: 100%
- Any Hidden Cost: $0.00
- Auto Recharge: No
- Updates Intimation: by Email
- Technical Support: Free
- PDF Compatibility: Windows, Android, iOS, Linux
- Test Engine Compatibility: Mac / Windows / Android / iOS / Linux
Premium PDF with 635 Q&A
Get Full VersionAll Atlassian Exams
Atlassian ExamsCertification and Entry Test Exams
Complete exam list