PMI PMI-200 Questions & Answers

Full Version: 145 Q&A


Latest PMI-200 Exam Questions and Practice Tests 2024 - Killexams.com

Latest PMI-200 Practice Tests with Actual Questions


Get Complete pool of questions with Premium PDF and Test Engine


Exam Code : PMI-200
Exam Name : PMI-Agile Certified Practitioner (PMI-ACP)
Vendor Name :
"PMI"








PMI-200 Dumps

PMI-200 Braindumps PMI-200 Real Questions PMI-200 Practice Test

PMI-200 Actual Questions


PMI


PMI-200


PMI-Agile Certified Practitioner (PMI-ACP)


https://killexams.com/pass4sure/exam-detail/PMI-200




Answer: C



Question: 134

When are acceptance tests typically written for a user story?


  1. After coding the story, but before user acceptance testing begins

  2. After writing the story, but before coding begins

  3. At the start of Product Backlog prioritization planning

  4. After estimating the Product Backlog, but before Sprint planning begins




Answer: C



Question: 135

Which of the seven principles of software development is best intended to solve the problem of inventories causing hidden errors in the process?


  1. Fast-Flexible-Flow

  2. Optimize the Whole

  3. Deliver Early and Often

  4. Eliminate Waste




Answer: D



Question: 136

What do project reports show during the Sprint review meeting?


  1. Estimates compared to the baseline

  2. Actual results to the plan

  3. Return on investment (ROI)

  4. Earned value measurement (EVM)




Answer: C



Question: 137

The purpose of "setting the stage'' in a project retrospective is to:


  1. Restate the goal of the meeting and create an open atmosphere.

  2. Review the scope statement and summarize project results.

  3. Elevate the team's morale and ensure that everyone participates.

  4. Describe the next Iteration and discuss lessons learned.




Answer: A



Question: 138

A full cycle of design-code-verifyrelease practiced by extreme Programming (XP) teams is called:


  1. Story

  2. Timebox

  3. Iteration

  4. Burndown




Answer: C



Question: 139

When facilitated and managed well, the primary benefits of a project retrospective should be to:


  1. Increase empowerment and enjoyment for the team.

  2. Identify the most important issues for the sponsors.

  3. Provide an open forum for team member complaints.

  4. Allow the team to get ahead on release planning.




Answer: D



Question: 140

In a Lean project environment, visual controls:


  1. Can be used by management for communicating specific corrective direction.

  2. Are easy to use, reflect the team's progress, and show the team what to do next.

  3. Are helpful while the team is forming but are less important for more experienced teams.

  4. Should be kept to a minimum to avoid distracting the team from high-value activities.




Answer: A



Question: 141

Which term best describes an Agile project's approach to risk analysis?


  1. Regression

  2. Pareto

  3. Qualitative

  4. Monte Carlo




Answer: D



Question: 142

The primary purpose of a Sprint retrospective is for the team to:


  1. Review stories planned for the next sprint and provide estimates,

  2. Demonstrate completed user stories to the Product Owner.

  3. Discuss what went well, what didn't, and ways to improve.

  4. Individually provide status updates on user stories in progress.




Answer: C



Question: 143

In a Lean Software Development environment, the Project Leader strives to eliminate:


  1. Work in Process (WIP) and bugs.

  2. Delays and building what is not needed.

  3. Defects and features with low value stream values.

  4. Poor requirements and changing scope.




Answer: C



Question: 144

During iteration planning, the team is discussing the design for a user story. A team member states that a design document should be started since the system is complex in nature. Another team member responds that in Agile there is no documentation. How should the ScrumMaster respond?


  1. Agree that documentation should be avoided, since it slows the progress of the team.

  2. Explain that interactions are valued over documentation, but documentation is not forbidden.

  3. Ask the manager if the technical processes mandate that designs be documented.

  4. Ask the Product Owner if it is acceptable for the resources to spend time on documentation.




Answer: B



Question: 145

For a "caves and commonroom arrangement, the most appropriate prerequisite is that the people in the room must be working on:


  1. Whatever they choose.

  2. Individual projects.

  3. The same set of multiple projects,

  4. The same project.




Answer: D


User: Nataliya*****

The Killexams.com material is straightforward and sufficient to prepare for the pmi-200 exam. No other test practice that I used in conjunction with their practice tests was as helpful. I never thought I would pass this exam on my first attempt, but thanks to Killexams.com, I answered 76 questions with ease in the actual exam. I am grateful to them for providing such an innovative and powerful study material.
User: Luke*****

I am thrilled to share that I passed the pmi-200 certification exam with a 97% score! Initially, I was uncertain about the quality of the study materials, but practicing with the online test simulator and studying the content paid off. I am grateful to have found killexams.com, and their support was invaluable.
User: Cyril*****

Last month, I took the pmi-200 exam and passed it thanks to my preparation with the Killexams.com kit. It is a great exam practice test, more reliable than I expected. All questions are valid, and it includes a lot of preparation material. I passed with over 97%, the best score on the pmi-200 exam. I am not sure why so few IT professionals know about Killexams, or maybe it is just my conservative environment. In any case, I will recommend it to my friends, and it will be helpful to many.
User: Todor*****

Killexams.com is an excellent website that provides PMI-200 certification materials. When I found the site online, I was extremely excited because it was exactly what I had been searching for - real and affordable help that would save me from having to go through numerous books. The site provided enough test questions that proved to be very useful, and as a result, I was able to score highly in my PMI test. I am grateful for the services provided by Killexams.com.
User: Rostisla*****

The questions and answers on Killexams.com are explained in short and easy language, making them easy to understand and follow. Thanks to Killexams.com, I passed my PMI-200 exam with a healthy score of 69. I highly recommend Killexams.com for the training of the PMI-200 exam.

Features of iPass4sure PMI-200 Exam

  • Files: PDF / Test Engine
  • Premium Access
  • Online Test Engine
  • Instant download Access
  • Comprehensive Q&A
  • Success Rate
  • Real Questions
  • Updated Regularly
  • Portable Files
  • Unlimited Download
  • 100% Secured
  • Confidentiality: 100%
  • Success Guarantee: 100%
  • Any Hidden Cost: $0.00
  • Auto Recharge: No
  • Updates Intimation: by Email
  • Technical Support: Free
  • PDF Compatibility: Windows, Android, iOS, Linux
  • Test Engine Compatibility: Mac / Windows / Android / iOS / Linux

Premium PDF with 145 Q&A

Get Full Version

All PMI Exams

PMI Exams

Certification and Entry Test Exams

Complete exam list