BICSI RCDDv14 Questions & Answers

Full Version: 100 Q&A


Latest RCDDv14 Exam Questions and Practice Tests 2025 - Killexams.com


RCDDv14 Dumps RCDDv14 Braindumps RCDDv14 Real Questions RCDDv14 Practice Test RCDDv14 Actual Questions


BICSI


RCDDv14


BICSI Registered Communications Distribution Designer


https://killexams.com/pass4sure/exam-detail/RCDDv14


Question: 87


Before working on equipment, what is the FINAL step in the lockout/tagout (LOTO) procedure?

  1. Verify the equipment controls are in the proper operating position.

  2. Train workers to perform the LOTO process.

  3. Apply appropriate tags both locally and remotely.

  4. Confirm the device is de-energized by proving it will not run when started.

  5. Confirm all unnecessary items have been removed from the area.


Answer: C


Question: 88


Which two of the following are means in which radiated interference primarily enters electronic devices? (Select two options.)

  1. Proximity to interfering sources

  2. Missing or inadequate optical connections

  3. Missing or inadequate device or cable shielding

  4. Interface designs

  5. Input signal lines


Answer: A, C


Question: 89


For the MAXIMUM flexibility of a cabling system in a hierarchical star topology, ALL backbone cables and links to FR’s should be terminated at the

  1. HC (FD).

  2. IC (BD).

  3. TR

  4. MC (CD)

Which of the following statements Is CORRECT concerning best practice for horizontal cable management panels?

  1. One RU of management panel for each RU of cable patch panel plus one additional RU of cable management

  2. Two RU of cable management panel for each RU of patch panel

  3. Three RU of cable management panel for each RU of patch panel

  4. Two RUs of management panel for each RU of cable patch panel plus two additional RUs of cable management


Answer: A


Question: 91


Close out documentation is initially discussed in which of the following meetings?

  1. Prime Contractor and Subcontractor Meetings

  2. Kickoff Meeting

  3. Weekly Progress Meetings

  4. Vendor Meeting


Answer: A


Question: 92


Which two of the following are ADVANTAGES of underground conduit systems? (Select two options.)

  1. Provide additional physical cable protection

  2. Not adaptable for future facility placement or removal without disturbing the property

  3. Economical over a long life

  4. Require more installation time than aerial or direct-buried installations

  5. Route planning is not as critical as aerial or direct-burial


Answer: A, C


Question: 93


What is the MAXIMUM recommended length for A in the image below?



  1. 70 m (230 ft)

  2. 90 m (295 ft)

C. 100 m (320 ft)

D. 150 m (495 ft)

E. 300 m (985 ft)


Answer: B


Question: 94


Which of the following is TRUE about convenience receptacles?

  1. They are duplex or quad receptacles mounted on perimeter walls.

  2. They must be powered by emergency power to prevent loss of service.

  3. They shall be connected to occupancy sensors to ensure user safety.

  4. They increase the count of outlets needed on the equipment racks.

  5. They are those into which equipment, such as switches, shall be plugged


Answer: A


Question: 95


When designing a video communications network, which type of video communication link is two-person videoconferencing?

  1. Point-to-multipoint bidirectional

  2. Point-to-multipoint unidirectional

  3. Unidirectional

  4. PTP unidirectional

  5. PTP bidirectional


Answer: D

Question: 96

The type of apparatus housed in TRs varies greatly in size, purpose and function. Which two of the following active equipment is included? (Select two options.)

  1. Cross-connect facilities

  2. Telecommunication’s equipment

  3. Environmental controls

  4. Lighting controls

  5. Building system equipment


Answer: B, E


Question: 97


What is the MINIMUM fire rating for telecommunications spaces walls and wall linings, if not specified otherwise by local Authority Having Jurisdiction (AHJ)?

  1. One hour

  2. Two hours

  3. Three hours

  4. No minimum requirement


Answer: B


Question: 98


For optical fiber cabling, which of the following test instruments is used to locate and identify any anomalies?

  1. OTDR

  2. Optical power meter

  3. OLTS

  4. Spectrum analyzer


Answer: A


Question: 99


What is the OPTIMAL lime in the construction process for ICT submittals to be reviewed by the ICT distribution designer?

  1. After the contract is awarded and before project close out

  2. As part of the contract bid process to prevent project delays

  3. Before the contract is awarded

  4. At the beginning of the close out process

For a cost estimate, an ICT distribution designer should produce a document listing each task with a cost placed beside them. The type of document used is a

A. So

  1. spare ad sheet

  2. worksheet

  3. database


Answer: A


User: Tisha*****

I am grateful to Killexams.com for assisting me in passing my rcddv14 exam with a 92% score. Your questions and answers were beneficial. If someone practices all the questions in the set and memorizes them, they will undoubtedly pass. I have now passed three exams using your site, and I am grateful.
User: Jenny*****

For busy professionals like us, having access to practice questions and answers anytime, anywhere is invaluable. I am immensely grateful to Killexams.com for creating this incredible practice material, which proved to be very useful during the last few days leading up to the exam. With their revision practice tests, I secured 88% in the rcddv14 Exam. My only suggestion to the team is to expand their offering by creating an Android app so that people like us can study on-the-go.
User: Natasia*****

I highly recommend Killexams.com for those who plan to take the RCDDV14 exam. This exam training is notable as it provides the right questions and simulates the exam experience accurately. There is no useless information or irrelevant questions, making it better than any book or PDF I could find. It helped me and my friends pass the exam with ease.
User: Tanja*****

I was able to score 82% in the rcddv14 exam with five days of preparation, thanks to the very beneficial feature of downloading PDF documents in the bundle. This gave me ample room for effective practice, coupled with online tests and no restricted attempts limit. The answers given to every query by using you are 100% accurate. Thank you so much.
User: Tatyana*****

Thanks to killexams.com, I was able to pass the rcddv14 exam and receive my certification. Their materials are genuinely useful, and the exam simulator is excellent, accurately reproducing the exam. The killexams.com practice tests made it easy to pass the exam, and I highly recommend it to anyone preparing to take the rcddv14 exam.

Features of iPass4sure RCDDv14 Exam

  • Files: PDF / Test Engine
  • Premium Access
  • Online Test Engine
  • Instant download Access
  • Comprehensive Q&A
  • Success Rate
  • Real Questions
  • Updated Regularly
  • Portable Files
  • Unlimited Download
  • 100% Secured
  • Confidentiality: 100%
  • Success Guarantee: 100%
  • Any Hidden Cost: $0.00
  • Auto Recharge: No
  • Updates Intimation: by Email
  • Technical Support: Free
  • PDF Compatibility: Windows, Android, iOS, Linux
  • Test Engine Compatibility: Mac / Windows / Android / iOS / Linux

All BICSI Exams

BICSI Exams

Certification and Entry Test Exams

Complete exam list