Question: 87
Before working on equipment, what is the FINAL step in the lockout/tagout (LOTO) procedure?
1. Verify the equipment controls are in the proper operating position.
2. Train workers to perform the LOTO process.
3. Apply appropriate tags both locally and remotely.
4. Confirm the device is de-energized by proving it will not run when started.
5. Confirm all unnecessary items have been removed from the area.
Answer: C
Question: 88
Which two of the following are means in which radiated interference primarily enters electronic devices? (Select two options.)
1. Proximity to interfering sources
2. Missing or inadequate optical connections
3. Missing or inadequate device or cable shielding
4. Interface designs
5. Input signal lines
Answer: A, C
Question: 89
For the MAXIMUM flexibility of a cabling system in a hierarchical star topology, ALL backbone cables and links to FR’s should be terminated at the
1. HC (FD).
2. IC (BD).
3. TR
4. MC (CD)
Which of the following statements Is CORRECT concerning best practice for horizontal cable management panels?
1. One RU of management panel for each RU of cable patch panel plus one additional RU of cable management
2. Two RU of cable management panel for each RU of patch panel
3. Three RU of cable management panel for each RU of patch panel
4. Two RUs of management panel for each RU of cable patch panel plus two additional RUs of cable management
Answer: A
Question: 91
Close out documentation is initially discussed in which of the following meetings?
1. Prime Contractor and Subcontractor Meetings
2. Kickoff Meeting
3. Weekly Progress Meetings
4. Vendor Meeting
Answer: A
Question: 92
Which two of the following are ADVANTAGES of underground conduit systems? (Select two options.)
1. Provide additional physical cable protection
2. Not adaptable for future facility placement or removal without disturbing the property
3. Economical over a long life
4. Require more installation time than aerial or direct-buried installations
5. Route planning is not as critical as aerial or direct-burial
Answer: A, C
Question: 93
What is the MAXIMUM recommended length for A in the image below?
1. 70 m (230 ft)
2. 90 m (295 ft)
C. 100 m (320 ft)
D. 150 m (495 ft)
E. 300 m (985 ft)
Answer: B
Question: 94
Which of the following is TRUE about convenience receptacles?
1. They are duplex or quad receptacles mounted on perimeter walls.
2. They must be powered by emergency power to prevent loss of service.
3. They shall be connected to occupancy sensors to ensure user safety.
4. They increase the count of outlets needed on the equipment racks.
5. They are those into which equipment, such as switches, shall be plugged
Answer: A
Question: 95
When designing a video communications network, which type of video communication link is two-person videoconferencing?
1. Point-to-multipoint bidirectional
2. Point-to-multipoint unidirectional
3. Unidirectional
4. PTP unidirectional
5. PTP bidirectional
Answer: D
Question: 96
The type of apparatus housed in TRs varies greatly in size, purpose and function. Which two of the following active equipment is included? (Select two options.)
1. Cross-connect facilities
2. Telecommunication’s equipment
3. Environmental controls
4. Lighting controls
5. Building system equipment
Answer: B, E
Question: 97
What is the MINIMUM fire rating for telecommunications spaces walls and wall linings, if not specified otherwise by local Authority Having Jurisdiction (AHJ)?
1. One hour
2. Two hours
3. Three hours
4. No minimum requirement
Answer: B
Question: 98
For optical fiber cabling, which of the following test instruments is used to locate and identify any anomalies?
1. OTDR
2. Optical power meter
3. OLTS
4. Spectrum analyzer
Answer: A
Question: 99
What is the OPTIMAL lime in the construction process for ICT submittals to be reviewed by the ICT distribution designer?
1. After the contract is awarded and before project close out
2. As part of the contract bid process to prevent project delays
3. Before the contract is awarded
4. At the beginning of the close out process
For a cost estimate, an ICT distribution designer should produce a document listing each task with a cost placed beside them. The type of document used is a
A. So
1. spare ad sheet
2. worksheet
3. database
Answer: A

User: Aleksandr*****

I am grateful to killexams.com for providing a comprehensive guide on how to use their questions and answers effectively. With their help, I was able to score 78% on my RCDDV14 exam. This was my first time taking this exam, and although I felt confident, I still needed to prepare well. Therefore, I used killexams.com questions and answers along with their exam simulator software, which proved to be very useful.
User: Valeriya*****

Joining killexams.com was the best decision I made on my journey towards the RCDDV14 certification. I was excited to be able to pass the exam and be the first in my company with this qualification. Thanks to the materials on this website, I passed my RCDDV14 exam and made everyone proud. I highly recommend that any student who wants to experience the same feeling should give killexams.com a try.
User: Wesley*****

Becoming RCDDV14 certified was my goal, and passing the RCDDV14 exam was crucial. I failed the exam twice, but fortunately, my cousin introduced me to the killexams.com material. The Questions and Answers material inspired me, and I scored 89%. The material was well-formatted and covered essential requirements. I am confident that this material is the perfect exam preparation resource.
User: Zoria*****

If you are searching for a dependable rcddv14 practice test and desire to understand the tests nuances, look no further than Killexams.com. Their exam engine is excellent, and the education I received from their study materials was unparalleled. The course content and practice questions were tremendously helpful.
User: Camila*****

As an employee at Smart Corp, I was apprehensive about the rcddv14 exam, which contains difficult case studies. I used killexams.com question bank, and their explanations for the answers helped clear up my many doubts. They even sent me correctly solved case studies via email. Thanks to their materials, I was able to pass the exam with a score of 73.75%, and I give all the credit to killexams.com. I look forward to passing more exams with their help.

Features of iPass4sure RCDDv14 Exam

  • Files: PDF / Test Engine
  • Premium Access
  • Online Test Engine
  • Instant download Access
  • Comprehensive Q&A
  • Success Rate
  • Real Questions
  • Updated Regularly
  • Portable Files
  • Unlimited Download
  • 100% Secured
  • Confidentiality: 100%
  • Success Guarantee: 100%
  • Any Hidden Cost: $0.00
  • Auto Recharge: No
  • Updates Intimation: by Email
  • Technical Support: Free
  • PDF Compatibility: Windows, Android, iOS, Linux
  • Test Engine Compatibility: Mac / Windows / Android / iOS / Linux

Premium PDF with 100 Q&A

Get Full Version

All BICSI Exams

BICSI Exams

Certification and Entry Test Exams

Complete exam list