Certification Practice Test | PDF Questions | Actual Questions | Test Engine | Pass4Sure
CCE-CCC : Certified Cost Consultant / Cost Engineer (AACE International) Exam
PMI CCE-CCC Questions & Answers
Full Version: 95 Q&A
CCE-CCC Dumps
CCE-CCC Braindumps
CCE-CCC Real Questions
CCE-CCC Practice Test
CCE-CCC Actual Questions
PMI
CCE-CCC
Certified Cost Consultant / Cost Engineer (AACE International)
https://killexams.com/pass4sure/exam-detail/CCE-CCC
:
QUESTION 87
The following question requires your selection of CCC/CCE Scenario 4 (2.7.50.1.1) from the right side of your split screen, using the drop down menu,
to reference during your response/choice of responses.
If steel costs $1800/ton at the end of Year 3, what is the price of steel at the end of Year 4?
A. $1890/ton
B. $1863/ton
C. $1948/ton
D. $1836/ton
Answer: D
:
QUESTION 88
AACE International defines _____________as a technique of economic evaluation that sums over a given study period, the costs of initial investment,
replacements, operations, and maintenance/repair; expressed in either present or annual value terms.
A. Risk analysis
B. Benefit/Cost ratio (B/C) method
C. Net present worth method
D. Life cycle costs method (LCC)
Answer: D
:
QUESTION 89
______________can be defined as the determination of that course of action or combination of alternatives that yields either the lowest cost or the
highest profit.
A. Economic optimization
B. Simulation
C. Linear programming
D. Dynamic programming
Answer: D
:
QUESTION 90
What is executed in connection with a contract and secures the performance and fulfillment of all the undertakings, covenants, terms, conditions and
agreements contained in the contract?
A. Liability insurance
B. Performance bond
C. Bid bond
D. Surety bond
Answer: B
:
QUESTION 91
Productivity increases with time. This improvement is commonly associated with improvements in efficiency brought about by increased experience and
skill levels. What does this scenario describe?
A. Productivity efficiency factor
B. Value engineering
C. Cash flow
D. The learning curve
Answer: D
:
QUESTION 92
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded.
Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the
design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
Which of the following methods a used for creating critical path schedules:
A. Precedence diagram method
B. Precedence and arrow diagram methods only
C. Gantt chart (bar chart) method
D. Arrow diagram method
Answer: B
:
QUESTION 93
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded.
Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the
design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
You are reporting on a roadway project, which was estimated to be 10 miles of road. It was scheduled to be completed in 16 weeks, which is this week.
According to your calculations, the project has a schedule performance index of 0.80. What would you advise the management about the scheduled
completion date?
A. Project will be completed in 20 more weeks
B. Project will be completed this week - on schedule
C. Project will be completed in 4 more weeks
D. Project will be completed in 12.8 more weeks
Answer: C
:
QUESTION 94
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded.
Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the
design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
The project scheduler left the company and has left unfinished work. You have been hired as the new project scheduler and must update the existing
schedule. What will be your first task?
A. Recalculate the early finish for each activity
B. Recalculate the early start for each activity
C. Update the remaining duration for each activity
D. Recalculate the critical path
Answer: D
:
QUESTION 95
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded.
Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the
design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
The recognition of loss of value of a natural resource used in the production process is referred to as:
A. Capital reduction
B. Net loss
C. Depreciation
D. Depletion
Answer: D
:
User: Ayra***** I just passed the CCE-CCC exam with a top score and have to thank killexams.com for making it possible. I used their exam simulator as my primary study source and got a solid passing score. Its very reliable, and I am happy I trusted Killexams. Everything on their platform is professional and reliable. Two thumbs up from me. |
User: Valentina***** killexams.com Questions and Answers are the ideal way to prepare and pass IT exams. I wish more people knew about their products. However, if more people knew about them, there would be a greater risk of them being shut down. Their materials provided me with the knowledge I needed to pass my exam with 88% marks. My colleague also used killexams.com Questions and Answers for various certificates, and all were great and reliable. They are my top pick for exam preparation. |
User: Nora***** For a reliable cce-ccc practice test and the best training ever, killexams.com is the ultimate source of help. The exam simulator guided me through every aspect of the exam and provided the best questions and answers I have ever seen. |
User: Catherine***** As an IT professional, passing the CCE-CCC exam was important to me, but time restraints made it difficult to prepare. The easy-to-memorize answers in the Killexams.com test guide made it easy to put together. It worked as a whole reference guide, and I was surprised by the result. I read the Killexams.com test guide two weeks before the exam, finished all of the questions well beneath the stipulated time, and passed. |
User: Lia***** Finally, I want to express my sincere gratitude to Killexams.com for their practice tests and Exam Simulator. I passed the exam with 84% marks within the stipulated time. It is challenging to study for a certification exam while working full-time, but Killexams.com made it possible for me. I decided to take the cce-ccc exam to advance my career, and I am glad that I did. |
Features of iPass4sure CCE-CCC Exam
- Files: PDF / Test Engine
- Premium Access
- Online Test Engine
- Instant download Access
- Comprehensive Q&A
- Success Rate
- Real Questions
- Updated Regularly
- Portable Files
- Unlimited Download
- 100% Secured
- Confidentiality: 100%
- Success Guarantee: 100%
- Any Hidden Cost: $0.00
- Auto Recharge: No
- Updates Intimation: by Email
- Technical Support: Free
- PDF Compatibility: Windows, Android, iOS, Linux
- Test Engine Compatibility: Mac / Windows / Android / iOS / Linux
Premium PDF with 95 Q&A
Get Full VersionAll PMI Exams
PMI ExamsCertification and Entry Test Exams
Complete exam list