Question: 41
True or False: Scrum Events, Scrum Team Accountabilities, and Scrum Artifacts are augmented when using Scrum
with Kanban. For example, having a clear indicator of the age of active Sprint Backlog items may help the Scrum
Team during the Daily Scrum, helping them to better Inspect and Adapt their daily work.
A. True
B. False
Answer: A
Explanation:
Adding Kanban to Scrum provides a technique to help the Scrum Team focus on driving a continuous flow of activity
but does not negate value provided by the Scrum Events, Scrum Artifacts, and Scrum Team Accountabilities. However,
flow-based metrics/charts & forecasts may get added to Scrum Events as per the Kanban Guide for Scrum Teams.
Question: 42
True or False: Work Item Age is a leading indicator for the length of the Scrum Team’s feedback loop for that (in
progress) item.
A. True
B. False
Answer: A
Explanation:
If an item is aging quite a bit it is certainly an indication that its Cycle Time will be high. Cycle Time throughout the
Scrum Team’s definition of Workflow can also be considered the length of the team’s feedback loop.
Question: 43
In the middle of a Sprint, a Product Owner has requested the Developers to add a new urgent item to their Sprint
Backlog. The team is currently at their WIP Limit.
Which would be the two most appropriate responses? (choose the two best answers)
A. Reject the urgent item because the WIP Limits do not allow it. Tell the Product Owner to wait until the next Sprint.
B. Add the urgent item to their Sprint Backlog but only start working on that new item when enough room frees up.
C. Take on the urgent item as an exception to the WIP Limits, pushing this item along on top of the existing flow and
note a WIP exception.
D. Adjust the WIP Limits to allow for taking on the extra item and update their definition of Workflow.
Answer: B,C
Explanation:
In case an item is pulled into the Sprint Backlog, the Developers need to figure out whether they can actually start it
right away. This depends on the WIP limits and the current WIP. If the team is at their WIP limit they shouldn’t pull
in that new item until some room frees up. If their backlog items are pretty small, an empty WIP slot will free up pretty
quickly. If items are big, it can take a while.
The longer it might take to get a normal pull slot ready, the more pressure there might be to actually expedite this card,
going beyond the current WIP limits, and pushing this item along on top of the existing flow. The typical way to do
this is NOT to change the WIP limit definition but to go above WIP and note a WIP exception. These exceptions can
then be a topic for inspection and adaptation come time to retrospect.
Question: 44
Reducing batch sizes might have the following impact: (choose all that apply)
A. Highlight a need to improve processes/infrastructure to reduce the pain of frequent costly overhead.
B. Improving efficiency due to faster feedback loops.
C. Lower efficiency due to overhead/transaction costs in case the batch size is too small.
D. Higher motivation due to seeing your work get done and deliver value earlier.
Answer: A,B,C,D
Explanation:
Reducing batch sizes is a powerful lever with many potential effects. Finding the right batch size requires inspection
and adaptation by the Scrum Team based on seeing their flow in action and the effect on different soft and hard
metrics.
Question: 45
What can a specific work item’s Cycle Time metric be used for? (choose the best three answers)
A. To influence the team’s Service Level Expectation (SLE).
B. To help the team inspect and adapt their process.
C. As a leading indicator to the length of feedback loop for that Work Item.
D. As a lagging indicator to the length of feedback loop for that Work Item.
E. To help the team inspect and adapt their Sprint in the Daily Scrum.
Answer: A,B,D
Explanation:
Cycle time metric is a lagging indicator of flow. It is available only after an item is actually finished from the
workflow perspective (e.g. reached a Done lane on the Kanban board). It is typically used to drive improvement work
as well as to be able to establish internal/external expectations as to the team’s turnaround time on specific items.
WIP and Work Item Age are leading indicators for the length of feedback loop of a Work Item and inspecting and
adaptation of the Sprint at the Daily Scrum.
Question: 46
The basic metrics of flow that Scrum Teams using Kanban will need to track are: (choose the four best answers)
A. Lead Time
B. Velocity
C. Work in Progress (WIP)
D. Cycle Time
E. Throughput
F. Work Item Age
Answer: C,D,E,F
Explanation:
The four basic metrics of flow that Scrum Teams using Kanban need to track are as follows:
Work in Progress (WIP): The number of work items started but not finished.
Cycle Time: The amount of elapsed time between when a work item starts and when a work item finishes.
Work Item Age: The amount of time between when a work item started and the current time. This applies only to
items that are still in progress.
Throughput: The number of work items finished per unit of time.
Question: 47
Which of these are LEAST likely to be included in the definition of "Workflow" policies? (choose the best three
answers)
A. Definition of Done.
B. Work Item types.
C. Pull/prioritization policies.
D. A Gantt chart.
E. Service Level Expectations.
F. The Increment.
G. A Burndown chart.
H. Visualization policies.
I. WIP Limits.
Answer: D,F,G
Explanation:
The definition of "Workflow" includes a shared understanding within the Scrum Team of how work is defined (work
items), the start state of the process, the active states for the work items, and the finished state of the process.
This includes a description of:
Defined points at which the Scrum Team considers work to have started and to have finished.
A definition of the individual units of customer value that are flowing through the Scrum Team’s system (most likely
Product Backlog Items (PBIs).
A definition of the workflow states that the PBIs flow through from start to finish (of which there must be at least one
active state).
Explicit policies about how work flows through each state (which may include items from a Scrum Team’s definition
of "Done" and pull policies between stages). A definition of how Work in Progress (WIP) will be limited.
A set Service Level Expectation (SLE) that communicates a forecast of how long it should take to complete work
items.
This definition of "Workflow" is a strategic level whereas specific tools and artifacts are tactical and executional level.
Question: 48
Which two items would you expect to see in a service level expectation (SLE)? (choose the best two answers)
A. A probability
B. A period off elapsed day
C. A forecasted date
D. A cost of engineering
Answer: A,B
Explanation:
An SLE forecasts how long it should take a given item to flow from start to finish within your workflow. The SLE
itself has two parts: a period of elapsed days and a probability associated with that period (e.g., "85% of work items
will be finished in 8 days or less" which can also be stated as "8 days with 85% confidence/probability").
Question: 49
Workflow can be thought of as the Scrum Team’s policy for which of the following? (choose the best answer)
A. Defining when development is complete and validation begins.
B. How to get work done.
C. How to increase the Team’s WIP limit.
D. What completed work looks like.
Answer: B
Explanation:
This is similar to how the Definition of Done can be considered the team’s policies for what done looks like.
Question: 50
Little’s Law is extremely valuable for directly predicting the future since it gives us a measure of what happened in the
past? (Choose the best answer)
A. True – By understanding our Cycle Time we can use Little’s Law to reduce our WIP limits.
B. False – Relying only on your Cycle Time measurements may incorrectly influence you to cut your WIP limits.
Answer: B
Explanation:
Little’s law cannot predict the future. For example, the effect of reducing WIP limits cannot be predicted – it depends
on whether the Scrum Team can achieve effective flow with lower WIP limits.
For More exams visit https://killexams.com/vendors-exam-list

User: Marisha*****

I had been putting off taking the psk-i exam due to my busy work schedule, but killexams questions and answers inspired me to finally take the test. The support provided was invaluable, and it helped clear all my doubts about the psk-i topic. I am thrilled to have achieved a 97% score, and I credit Killexams for their wonderful support.
User: Venera*****

I am grateful to have come across killexams.com and their PSK-I practice tests, which I used to pass my exam. I want to express my appreciation and thanks for the motivation and inspiration they provided me. The questions and answers, along with the exam simulator, were supportive and detailed. I highly recommend this site to anyone preparing for certification exams.
User: Fred*****

I felt a great sense of pride and accomplishment when I finished my PSK-I exam. I attribute my success to the comprehensive question and answer materials provided by Killexams.com. Their practice test covered all of the relevant topics, and the answers were concise and easy to understand. I was lucky enough to have many of the questions on the exam come directly from the guide. Thanks to Killexams.com, I was able to pass with ease.
User: Stephanie*****

Preparing for the PSK-I certification can be a complicated process, and without appropriate guidance, nine out of ten people fail. This is where the first-class PSK-I ebook comes in! It provides you with comprehensive materials that not only enhance your training but also reduce the risk of failing the PSK-I exam and missing out on university admission. I used this terrific software, and I scored 42 marks out of 50. I can assure you that it is an excellent way to prepare for the exam.
User: James*****

Working in an IT firm means that I have limited time to prepare for the PSK-I exam. So, I opted for Killexams.com Questions and Answers practice tests, and to my surprise, it worked wonders for me. I had to answer all the questions in the least possible time, and the questions were quite easy to understand with a fantastic reference guide. I scored 939 marks, which was a great surprise for me. Thanks to Killexams!

Features of iPass4sure PSK-I Exam

  • Files: PDF / Test Engine
  • Premium Access
  • Online Test Engine
  • Instant download Access
  • Comprehensive Q&A
  • Success Rate
  • Real Questions
  • Updated Regularly
  • Portable Files
  • Unlimited Download
  • 100% Secured
  • Confidentiality: 100%
  • Success Guarantee: 100%
  • Any Hidden Cost: $0.00
  • Auto Recharge: No
  • Updates Intimation: by Email
  • Technical Support: Free
  • PDF Compatibility: Windows, Android, iOS, Linux
  • Test Engine Compatibility: Mac / Windows / Android / iOS / Linux

Premium PDF with 50 Q&A

Get Full Version

All Scrum Exams

Scrum Exams

Certification and Entry Test Exams

Complete exam list